12.01.2015 Views

Conference Proceedings : “JANASEVANA” National ... - UN HABITAT

Conference Proceedings : “JANASEVANA” National ... - UN HABITAT

Conference Proceedings : “JANASEVANA” National ... - UN HABITAT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1/5/2012<br />

Curing and protection<br />

• Since the soil mixture contains cement,<br />

constructed wall shall be cured well for a period<br />

of at least 7 days<br />

• Curing shall be commenced from following day<br />

by keeping the wall damp with moist covering<br />

or wet gunny bags or any other method except<br />

pouring water under pressure<br />

• Green work shall be protected from rain by<br />

suitable covering.<br />

Electrical Wiring<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!