11<br />
modifying the equipment may introduce a risk, as further development or integration<br />
work may be required.<br />
3.15 Fitness-for-purpose issues are described in a specific section of the TRA<br />
document. Importantly, because issues are separate from risks, they do not affect<br />
the overall level of technical risk.<br />
<strong>Technical</strong> risk sources<br />
3.16 There are many potential sources of risk to a project, both internal <strong>and</strong> external,<br />
as illustrated in Figure 4 (Figure 4 is not a comprehensive list of all risk sources). The<br />
TRA addresses risks that arise from technical sources, both internally <strong>and</strong> externally<br />
sources.<br />
Internal<br />
External<br />
Workforce<br />
Integration<br />
Economy<br />
Political<br />
Uncertainties<br />
here<br />
<strong>Technical</strong> Engineering<br />
Project Management<br />
Technology<br />
Budget<br />
Climate<br />
Industry<br />
Legal<br />
<strong>Technical</strong><br />
Other Projects<br />
can effect<br />
project’s<br />
objectives<br />
Performance Cost Schedule<br />
Safety<br />
Supportability<br />
Figure 4: Sources of risk<br />
3.17 There are two broad types of risk that arise from technical sources:<br />
• For a technology that is still being developed there is a likelihood that the<br />
technology will not be developed in the time <strong>and</strong> funding available. This<br />
could lead to a potential impact on the required performance, cost <strong>and</strong>/or<br />
schedule. This is termed a technology risk.<br />
• If the sub-systems are still being developed <strong>and</strong> have not been integrated<br />
<strong>and</strong> demonstrated in the system sought or the system into the ADF, there<br />
is the likelihood that the system will not achieve the level of performance<br />
required. This could lead to a potential impact on the required<br />
performance, cost <strong>and</strong>/or schedule. This results in a technical risk.<br />