27.07.2012 Views

IPET Report 3 Vol VIII

IPET Report 3 Vol VIII

IPET Report 3 Vol VIII

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Vol</strong>ume <strong>VIII</strong><br />

Engineering and Operational Risk and<br />

Reliability Analysis<br />

This report is not intended as a final expression of the findings or conclusions of the United States Army<br />

Corps of Engineers, nor has it been adopted by the Corps as such. Rather, this is a preliminary report<br />

summarizing data and interim results compiled to date. As a preliminary report, this document and the<br />

information contained therein are subject to revisions and changes as additional information is obtained.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!