27.07.2012 Views

IPET Report 3 Vol VIII

IPET Report 3 Vol VIII

IPET Report 3 Vol VIII

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 8<br />

Final Plan for the Mid-Resolution Runs<br />

Parameter Factorial 1<br />

ΔP (mb)<br />

V (km/h)<br />

Xcos(θ) (km)<br />

θ.<br />

R max<br />

B<br />

---------------<br />

ΔP R (t)<br />

V R(t)<br />

R max (t)<br />

B(t)<br />

α<br />

41, 80, 115<br />

8, 21, 36<br />

-130, -90, -50, -10, 30, 70, 110<br />

-60, -30, 0, 30, 60<br />

10%, 50%, 90% quantile from Eq. 8-2<br />

50% quantile from Eq. 8-3<br />

-------------------------------------------<br />

ΔP R,0.5(t) from Figure 8-5<br />

V R,0.5(t) from Figure 8-6<br />

from Eq. 8-5<br />

from Eq. 8-6<br />

0.035 + 0.0005ΔP<br />

Mid-resolution model runs<br />

Factorial 2<br />

No. of runs 945 210<br />

Total runs 1155<br />

80<br />

21<br />

-130, -90, -50, -10, 30, 70, 110<br />

-60, -30, 0, 30, 60<br />

10%, 50%, 90% quantile from Eq. 8-2<br />

5%, 95% quantiles from Eq. 8-3<br />

-------------------------------------------<br />

ΔP R,0.5(t) from Figure 8-5<br />

V R,0.5(t) from Figure 8-6<br />

from Eq. 8-5<br />

from Eq. 8-6<br />

0.035 + 0.0005ΔP<br />

For the HR runs, the subset of 36 hurricanes in Table 9 is retained. In general, the levels in<br />

Table 9 have been chosen to maximize the accuracy of calibration of the MR results. The<br />

individual hurricane paths considered in the risk analysis are shown in Figure 14.<br />

Table 9<br />

Factorial Plan for the High-Resolution Runs<br />

Parameter High-resolution model runs<br />

ΔP (mb)<br />

V (km/h)<br />

Xcos(θ) (km)<br />

θ.�<br />

R max<br />

B<br />

-----------------<br />

ΔP R (t)<br />

V R (t)<br />

R max (t)<br />

B(t)<br />

α<br />

No. of cases 36<br />

80, 115<br />

21<br />

-90, -10, 70<br />

-60, 0, 60<br />

10%, 90% quantiles from Eq. 8-2<br />

50% quantile from Eq. 8-3<br />

-------------------------------------------------<br />

ΔP R,0.5(t) from Figure 8-5<br />

V R,0.5(t) from Figure 8-6<br />

from R max, ΔP(t) and Lat(t); see Eq. 8-5<br />

from B, R max and Lat(t); see Eq. 8-6<br />

0.035 + 0.0005ΔP<br />

<strong>Vol</strong>ume <strong>VIII</strong> Engineering and Operational Risk and Reliability Analysis <strong>VIII</strong>-35<br />

This is a preliminary report subject to revision; it does not contain final conclusions of the United States Army Corps of Engineers.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!