Petroleum Development Oman<br />
<strong>Estate</strong> <strong>Service</strong>s <strong>Asset</strong><br />
Environmental Assessment<br />
2002 Review and Update<br />
The specification outlines specific ecological zones and based on their importance,<br />
defines specific requirements for carrying out projects. These are summarized in<br />
Table 2.13 below.<br />
Table 2.13: Classification of Environmentally Sensitive Areas<br />
Ecological Zone Description Requirements<br />
Zone 1: Areas of<br />
Concern<br />
National reserves or sanctuaries<br />
Areas that provide habitat to particularly<br />
sensitive wildlife<br />
Areas containing high proportions of<br />
endemic flora or fauna<br />
Woodlands<br />
Activities shall be<br />
restricted<br />
Zone 2: Areas of Interest<br />
Areas of exceptional natural beauty<br />
Areas having significant natural features<br />
and beauty<br />
Areas showing features of geological or<br />
climatic history<br />
Activities shall be<br />
restricted for those not<br />
compatible with the<br />
protection of the area<br />
Artificially created areas to attract<br />
wildlife and migratory birds<br />
Arabian Oryx Sanctuary Area defined by RD 9/94 Case-specific approval<br />
from MRME&WR<br />
2.4.9 Land Management<br />
There is currently no specific Omani legislation on land management (site<br />
preparation, abandonment and restoration). <strong>PDO</strong>’s policy on abandonment requires<br />
that redundant assets shall be removed where appropriate and the environment<br />
restored to, or as near as reasonably practicable, to its original state. <strong>PDO</strong><br />
specification SP-1012 on land management is summarized below in Table 2.14.<br />
Table 2.14: Land Management Requirements<br />
Project Stage Requirements<br />
Site Selection - Selection of a site shall be carried out in accordance with <strong>PDO</strong>’s<br />
procedure on HEMP and environmental assessment guideline<br />
Site Preparation - Earthmoving shall be conducted to minimize environmental effects<br />
- Trees shall not be felled or removed<br />
- Borrow pits shall not be excavated more than 2m in depth<br />
- Borrow pits shall not be excavated in wadis, in areas used by grazing<br />
livestock or in areas which would cause nuisance to local inhabitants<br />
- A 20m wide right-of-way shall be provided for all pipelines (10m each<br />
side)<br />
- Where pipelines or roads cross wadis, earthmoving shall be carried out<br />
to minimize flow or characteristics of shallow aquifers<br />
©HMR Environmental Engineering Consultants C2- 12<br />