Petroleum Development Oman<br />

<strong>Estate</strong> <strong>Service</strong>s <strong>Asset</strong><br />

Environmental Assessment<br />

2002 Review and Update<br />

The specification outlines specific ecological zones and based on their importance,<br />

defines specific requirements for carrying out projects. These are summarized in<br />

Table 2.13 below.<br />

Table 2.13: Classification of Environmentally Sensitive Areas<br />

Ecological Zone Description Requirements<br />

Zone 1: Areas of<br />

Concern<br />

National reserves or sanctuaries<br />

Areas that provide habitat to particularly<br />

sensitive wildlife<br />

Areas containing high proportions of<br />

endemic flora or fauna<br />

Woodlands<br />

Activities shall be<br />

restricted<br />

Zone 2: Areas of Interest<br />

Areas of exceptional natural beauty<br />

Areas having significant natural features<br />

and beauty<br />

Areas showing features of geological or<br />

climatic history<br />

Activities shall be<br />

restricted for those not<br />

compatible with the<br />

protection of the area<br />

Artificially created areas to attract<br />

wildlife and migratory birds<br />

Arabian Oryx Sanctuary Area defined by RD 9/94 Case-specific approval<br />

from MRME&WR<br />

2.4.9 Land Management<br />

There is currently no specific Omani legislation on land management (site<br />

preparation, abandonment and restoration). <strong>PDO</strong>’s policy on abandonment requires<br />

that redundant assets shall be removed where appropriate and the environment<br />

restored to, or as near as reasonably practicable, to its original state. <strong>PDO</strong><br />

specification SP-1012 on land management is summarized below in Table 2.14.<br />

Table 2.14: Land Management Requirements<br />

Project Stage Requirements<br />

Site Selection - Selection of a site shall be carried out in accordance with <strong>PDO</strong>’s<br />

procedure on HEMP and environmental assessment guideline<br />

Site Preparation - Earthmoving shall be conducted to minimize environmental effects<br />

- Trees shall not be felled or removed<br />

- Borrow pits shall not be excavated more than 2m in depth<br />

- Borrow pits shall not be excavated in wadis, in areas used by grazing<br />

livestock or in areas which would cause nuisance to local inhabitants<br />

- A 20m wide right-of-way shall be provided for all pipelines (10m each<br />

side)<br />

- Where pipelines or roads cross wadis, earthmoving shall be carried out<br />

to minimize flow or characteristics of shallow aquifers<br />

©HMR Environmental Engineering Consultants C2- 12<br />

Oman’s Environmental Consultancy<br />