20.01.2015 Views

Estate Service Asset - PDO

Estate Service Asset - PDO

Estate Service Asset - PDO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Petroleum Development Oman<br />

<strong>Estate</strong> <strong>Service</strong>s <strong>Asset</strong><br />

Environmental Assessment<br />

2002 Review and Update<br />

a concentration of 1.5-2 ppm. Automatic controllers are used to ensure that overdosing<br />

is avoided. The hypochlorite storage drums are placed on cemented floor with<br />

leak containment facilities.<br />

• Sewage leaks and spills<br />

About 1100 m 3 /d of sewage is generated. Sewage is transferred from the various<br />

points of generation to the STPs via a network of underground pipes. Since the pipes<br />

are buried at least a meter below the ground, no major leaks are expected. Minor leaks<br />

may be expected due to structural defects in the pipe joints or fittings. Such leaks are<br />

easily identified by the wetness of the surrounding soil, and the necessary repairs are<br />

promptly carried out.<br />

©HMR Environmental Engineering Consultants C4 - 10<br />

Oman’s Environmental Consultancy<br />

HMR\1501\<strong>Estate</strong> <strong>Service</strong>s

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!