Estate Service Asset - PDO
Estate Service Asset - PDO
Estate Service Asset - PDO
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Petroleum Development Oman<br />
<strong>Estate</strong> <strong>Service</strong>s <strong>Asset</strong><br />
Environmental Assessment:<br />
2002 Review and Update<br />
APPENDIX 3: <strong>PDO</strong>'S ENVIRONMENTAL RISK EVALUATION CRITERIA<br />
Rating of Consequence of Effect on Environment<br />
Slight effect: Local environmental damage. Within the fence and within<br />
systems. Negligible financial consequences<br />
Minor effect: Contamination. Damage sufficiently large to attack the<br />
environment. Single exceedance of statutory or prescribed criterion. Single<br />
complaint. No permanent effect on the environment.<br />
Localized effect: Limited loss of discharges of known toxicity. Repeated<br />
exceedance of statutory or prescribed limit. Affecting neighborhood.<br />
Major effect: Severe environmental damage. The company is required to<br />
take extensive measures to restore the contaminated environment to its<br />
original state. Extended exceedance of statutory limits<br />
Massive Effect: Persistent severe environmental damage or severe nuisance<br />
or nature conservancy extending over a large area. In terms of commercial or<br />
recreational use, a major economic loss for the company. Constant, high<br />
exceedance of statutory or prescribed limits<br />
A.<br />
Very<br />
low:<br />
Not<br />
heard of<br />
but could<br />
occur<br />
Rating of Frequency of Occurrence<br />
B. C.<br />
Low: Medium<br />
Has Has<br />
occurred occurred<br />
in other in oil<br />
industry and gas<br />
industry<br />
LOW RISK<br />
MEDIUM RISK<br />
HIGH RISK<br />
D.<br />
High:<br />
Occurs<br />
several<br />
times a<br />
year in<br />
oil and<br />
gas<br />
industry<br />
E.<br />
Very<br />
high:<br />
Occurs<br />
several<br />
times a<br />
year in<br />
<strong>PDO</strong><br />
EXTREME<br />
RISK<br />
HMR Environmental Engineering Consultants A3 - 1<br />
Oman’s Environmental Consultancy<br />
HMR/1501/HES