Issues i<br />

Product<br />

Locate waste and identify solutions<br />

Behaviour<br />

Training<br />

MAN<br />

No problem<br />

solving<br />

activity<br />

Incorrect<br />

Operation<br />

Training<br />

delays/<br />

waiting<br />

Ergonomics<br />

of processes<br />

Line Balance<br />

Takt<br />

METHOD<br />

Planning<br />

Space<br />

Flow<br />

Layout<br />

Locate<br />

Tooling<br />

Fetch Tooling<br />

Disruption<br />

Process<br />

Constraints<br />

Bottleneck<br />

Visibility<br />

Times<br />

Variation<br />

Issues<br />

Load/ Unload<br />

cycle times<br />

Availability<br />

Tooling<br />

Incorrect<br />

tools used<br />

Missing<br />

Locate<br />

correct Parts<br />

fetch<br />

Parts<br />

Overprocess<br />

Cost of<br />

Consumables<br />

New v Refurb<br />

Paint<br />

Gloves<br />

MACHINE<br />

MAT'L<br />

Fishbone Diagram of Identified Issues in Bogie Overhaul<br />

Many of the issues affected all the areas within the Bogie Overhaul Area, so we had to identify<br />

which were the main areas to focus on with the limited resource available. Based on the Baseline<br />

graph (above) it was recognised there were 4 key areas to focus on to achieve the overall<br />

objective of capacity improvement:<br />

1. Shot Blast<br />

2. Frame Exam<br />

3. Bolster assembly<br />

4. Assembly stage 1<br />

copyright UGC Limited 2008