Implement Solutions (cont’d)<br />
2. Frame Exam<br />
Identified Areas for Improvement<br />
456<br />
240<br />
Current<br />
Target<br />
Non-value added activity<br />
• Poor layout<br />
• Inappropriate tooling<br />
• Excessive variation<br />
• Work imbalance<br />
• Fetching parts<br />
Frame<br />
Exam<br />
During the frame examine<br />
process each part needs to<br />
be assessed as OK,<br />
Repair, or Replace<br />
Stock maintained of<br />
repaired parts ready<br />
to replace those<br />
requiring repair<br />
Storage of change parts<br />
& sub assy<br />
Kanban Board<br />
Material storage &<br />
handling<br />
Workplace<br />
Organisation<br />