21.01.2015 Views

Implementation Strategy V4 - Unipart Logistics

Implementation Strategy V4 - Unipart Logistics

Implementation Strategy V4 - Unipart Logistics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Implement Solutions (cont’d)<br />

2. Frame Exam<br />

Identified Areas for Improvement<br />

456<br />

240<br />

Current<br />

Target<br />

Non-value added activity<br />

• Poor layout<br />

• Inappropriate tooling<br />

• Excessive variation<br />

• Work imbalance<br />

• Fetching parts<br />

Frame<br />

Exam<br />

During the frame examine<br />

process each part needs to<br />

be assessed as OK,<br />

Repair, or Replace<br />

Stock maintained of<br />

repaired parts ready<br />

to replace those<br />

requiring repair<br />

Storage of change parts<br />

& sub assy<br />

Kanban Board<br />

Material storage &<br />

handling<br />

Workplace<br />

Organisation<br />

copyright UGC Limited 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!