Implementation Strategy V4 - Unipart Logistics
Implementation Strategy V4 - Unipart Logistics
Implementation Strategy V4 - Unipart Logistics
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Implement Solutions (cont’d)<br />
3. Bolster Assembly<br />
Identified Areas for Improvement<br />
458<br />
Current Non-value added activity<br />
• Poor layout<br />
• Inappropriate tooling<br />
• Poor process for airbags<br />
240<br />
Target<br />
• Hand painting<br />
• Fetching parts<br />
Bolster<br />
Assy<br />
Improve painting process<br />
Improved Refurbishment<br />
Process<br />
Improved Storage<br />
Improved airbag process and pipework processes by:<br />
• Laying out the Airbag process as a ‘U shaped cell’<br />
• Improving the painting process<br />
• Organising the workplace through 5S<br />
copyright UGC Limited 2008