Yogesh Prashar is principal investigator and project manager and is responsible for the analyses<br />

and the report, which was completed under the supervision of Mr. Atta Yiadom.<br />

1.4.2 Consultants<br />

Mr. Wayne Magnusen and Ms. Dona Mann of Alan Kropp and Associates (AKA) were the<br />

overall consultant project managers for the study and provided geotechnical peer review services<br />

for the project. Mr. James Joyce, of Joyce and Associates, performed the engineering geologic<br />

services, and was a sub-consultant to AKA. Dr. Walt Silva of Pacific Engineering and Analysis<br />

was also a sub-consultant to AKA and developed earthquake ground motions which were used in<br />

the deformation analysis.<br />

The consultant scope of work consisted of reviewing existing information; providing<br />

geotechnical, geologic, and seismologic data. The consultant review comments have been<br />

incorporated into the final report and they have found the approach, the analysis, and conclusions<br />

of this report to be satisfactory.<br />

<strong>Seismic</strong> Stability Evaluation <strong>Report</strong><br />

<strong>Dingee</strong> <strong>Reservoir</strong> Dam<br />

2<br />

August 2008