was then repeated for the surface course. Also, there was another reason for paving in<br />

this sequence. The inside lane was paved first and was the “control” strip for conducting<br />

the rolling pattern as well as verifying that all mix parameters were met before paving the<br />

outside lane.<br />

Most of the paving with the modified asphalts went without any problems except for two<br />

instances. During the paving of the binder course for MULTIGRADE, the lab tests showed<br />

that the air voids were not acceptable and the Engineer recommended removal of this<br />

asphalt. However, it was decided to finish out the MULTIGRADE paving but not consider<br />

this section a test section. MULTIGRADE asphalt was placed again later during the<br />

operation without any incident. Also, during the initial paving of the binder course for<br />

VESTOPLAST, the hose on the blower unit filled with asphalt and the operation was<br />

stopped. Due to the difficulty in getting another hose, VESTOPLAST did not continue in<br />

the paving or in the study.<br />

TEST SECTIONS<br />

The actual stationing of each modified section as well as the stationing of the transition<br />

sections and control section are given in table 4. This table lists the modified asphalts in<br />

the order that they were paved. A 1000 ft test section was chosen within each modified<br />

section to be used for testing and observation in the future. These section limits are shown<br />

in figure 13.<br />