No. Item<br />
App.<br />
Rev.<br />
Init.<br />
Reviewer Comments<br />
Init.<br />
C-14 Do all non-<strong>residential</strong> domestic (potable)<br />
water service laterals have reduced pressure<br />
backflow devices on the customer side of<br />
the meter<br />
C-15 Domestic water service laterals cannot be<br />
run across an adjacent property line (except<br />
under certain hardship cases). Is this<br />
requirement met<br />
C-16 Each building receiving water must have at<br />
least one water service lateral, coming<br />
directly off the main line, or off of a<br />
manifolded service assembly. Is this<br />
requirement met<br />
C-17 Water service laterals cannot come off of<br />
other water service laterals. Is this<br />
requirement met<br />
C-18 On single-family residences water service<br />
laterals may be dimensioned from the<br />
property line or by street stations. Is this<br />
requirement met<br />
C-19 Are the proper types of fire hydrants<br />
installed (MCWD Std. W-8)<br />
C-20 On single family residences, water service<br />
laterals shall not go under driveway<br />
approaches. Is this requirement met<br />
C-21 Are blowoffs installed at the end of all<br />
mains <strong>and</strong> large water service stubouts<br />
They are required for testing <strong>and</strong> flushing<br />
purposes.<br />
C-22 Are air vacuum release valves installed at<br />
all water main high points for 10-inch pipe<br />
<strong>and</strong> larger<br />
C-23 Do fire hydrant spacing <strong>and</strong> coverage<br />
comply with MCWD St<strong>and</strong>ard Section 3,<br />
Fig. 1, <strong>and</strong> with the requirements of the<br />
local Fire Marshal<br />
C-24 If project is <strong>residential</strong> or medium to largescale<br />
commercial/industrial, are there at<br />
least 2 points of <strong>connection</strong> to MCWD’s<br />
water system<br />
C-25 Are all existing MCWD domestic water<br />
facilities completely <strong>and</strong> correctly depicted<br />
C-26 Are all existing <strong>and</strong> proposed points of<br />
<strong>connection</strong> to existing domestic water<br />
facilities properly depicted<br />
June 2009 A5-12