25.01.2015 Views

appendix 1 residential connection form and permit application

appendix 1 residential connection form and permit application

appendix 1 residential connection form and permit application

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DOMESTIC WATER, SEWER, RECYCLED WATER<br />

BOND WORKSHEET<br />

DEVELOPMENT ADDRESS: ____________________________________<br />

CITY:___________________________ TRACT(S): ___________________<br />

DATE: _______________________________________________<br />

DEVELOPER: __________________________________________________<br />

DOMESTIC WATER<br />

ITEM QUANTITY UNIT COST<br />

($/unit)<br />

8” PVC LF<br />

12”PVC LF<br />

8” DIP LF<br />

12” DIP LF<br />

16” DIP LF<br />

8” VALVE EA<br />

12” VALVE EA<br />

16” VALVE EA<br />

8” HOT TAP EA<br />

12” HOT TAP EA<br />

16” HOT TAP EA<br />

B.O VALVE – 4” W EA<br />

B.O VALVE – 8” W EA<br />

B.O VALVE – 12” W EA<br />

B.O. VALVE – 16”W EA<br />

A.R. VALVE – 8” W EA<br />

A.R. VALVE – 12” W EA<br />

A.R. VALVE – 16” W EA<br />

FIRE HYDRANT EA<br />

4” DETECTOR CHECK EA<br />

6” DETECTOR CHECK EA<br />

8” DETECTOR CHECK EA<br />

10” DETECTOR CHECK EA<br />

RESIDENTIAL SERVICE EA<br />

COMMERCIAL SERVICE<br />

1-1/2” METER EA<br />

2” METER EA<br />

3” COMPOUND METER EA<br />

4” COMPOUND METER EA<br />

IRRIGATION SERVICE<br />

1-1/2” IRRIGATION SVC EA<br />

2” IRRIGATION SVC EA<br />

TOTAL<br />

Estimate to be prepared by Developer’s Engineer.<br />

Add lines as needed to cover the full scope of work.<br />

TOTAL COST<br />

(Dollars)<br />

DOMESTIC WATER BOND AMOUNT (Round up to nearest $1,000): _____________

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!