Study of Microfinance Sector Capacity Building in Sierra Leone
Study of Microfinance Sector Capacity Building in Sierra Leone
Study of Microfinance Sector Capacity Building in Sierra Leone
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1.4. Possible Limitations and Challenges<br />
The follow<strong>in</strong>g are the possible limitations and challenges to the smooth<br />
realization <strong>of</strong> this strategy:<br />
Assignment looked at the micr<strong>of</strong><strong>in</strong>ance <strong>in</strong>dustry, which is<br />
heavily affected by developments external to it. Although<br />
recommendations have been made on some <strong>of</strong> these, events<br />
and circumstances outside <strong>of</strong> the <strong>in</strong>dustry could affect the<br />
success <strong>of</strong> the strategy<br />
At the time <strong>of</strong> completion <strong>of</strong> this assignment, there doesn’t<br />
seem to be an obvious, strong and effective <strong>in</strong>stitution to<br />
champion the implementation <strong>of</strong> the strategy after the PPFSD<br />
project ends. MFP-NaCSA, the requestor <strong>of</strong> the assignment, has<br />
s<strong>in</strong>ce been significantly weakened by way <strong>of</strong> reduced<br />
pr<strong>of</strong>essional staff, cont<strong>in</strong>ued absence <strong>of</strong> operational funds and<br />
<strong>in</strong>adequate logistics<br />
There are considerable fundamental differences among<br />
stakeholders 8 that unless resolved are likely to affect the<br />
implementation <strong>of</strong> this strategy.<br />
8<br />
On their strategic th<strong>in</strong>k<strong>in</strong>g on key aspects <strong>of</strong> the <strong>in</strong>dustry<br />
page 6