25.01.2015 Views

Study of Microfinance Sector Capacity Building in Sierra Leone

Study of Microfinance Sector Capacity Building in Sierra Leone

Study of Microfinance Sector Capacity Building in Sierra Leone

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.3. Strategies to Achieve the Objectives<br />

The first phase <strong>of</strong> this assignment aimed at identify<strong>in</strong>g strategic gaps <strong>in</strong><br />

<strong>Sierra</strong> <strong>Leone</strong>’s micr<strong>of</strong><strong>in</strong>ance sector. On the basis <strong>of</strong> these strategic gaps,<br />

six strategic objectives were derived for <strong>in</strong>dustry capacity build<strong>in</strong>g (sec<br />

8.1 above). Under each strategic objective, a number <strong>of</strong> key desirable<br />

outputs or results have been identified. To atta<strong>in</strong> the five objectives, four<br />

broad strategies have been developed. The follow<strong>in</strong>g table summarises<br />

the four strategies and the objectives they each address. Appendices 1<br />

(logical framework) and 2 (activity matrix) to this report are vital parts <strong>of</strong><br />

the strategy. They expand the strategy and detail it out <strong>in</strong>to an<br />

implementable plan.<br />

TABLE 5: SUMMARY OF THE STRATEGY<br />

PROPOSED STRATEGY<br />

Establish a well staffed capacity<br />

build<strong>in</strong>g <strong>in</strong>stitution 16 (SMART-<br />

Cap) by Dec 2009, to manage/<br />

coord<strong>in</strong>ate activities<br />

implemented under the different<br />

w<strong>in</strong>dows as recommended.<br />

Establish SLAMFI as a strong,<br />

member-based <strong>in</strong>stitution 17<br />

Raise funds for all-round<br />

micr<strong>of</strong><strong>in</strong>ance capacity build<strong>in</strong>g,<br />

and for runn<strong>in</strong>g SMART-Cap<br />

Establish an effective MF<br />

wholesale fund – operated <strong>in</strong> a<br />

commercially viable and socially<br />

responsive way<br />

TO ADDRESS OBJECTIVE.<br />

1: Increase <strong>in</strong> geographical/ rural<br />

outreach by MFIs<br />

2: Broaden<strong>in</strong>g the product ranges <strong>of</strong> the<br />

beneficiary <strong>in</strong>stitutions<br />

3: <strong>Build<strong>in</strong>g</strong> the <strong>in</strong>ternal capacities <strong>of</strong> MFIs<br />

for susta<strong>in</strong>able growth.<br />

5: Bus<strong>in</strong>ess and f<strong>in</strong>ancial awareness <strong>of</strong><br />

the population enhanced<br />

4: Industry cohesion and collaboration<br />

promoted<br />

6: Fund<strong>in</strong>g for the <strong>in</strong>dustry (to support all<br />

the five objectives)<br />

6: Fund<strong>in</strong>g for the <strong>in</strong>dustry (Growth <strong>of</strong><br />

MFI portfolios, for them to extend their<br />

services, atta<strong>in</strong> greater outreach and<br />

grow susta<strong>in</strong>ably).<br />

1.3.1. Establishment <strong>of</strong> SMART-Cap<br />

In a sense, the most important strategy proposed <strong>in</strong> this report is the<br />

establishment <strong>of</strong> SMART-Cap. This will be a program managed<br />

<strong>in</strong>dependently by a competitively procured consult<strong>in</strong>g or project<br />

management firm, and whose head reports to a well constituted board<br />

compris<strong>in</strong>g <strong>of</strong> representatives from the Government, development<br />

partners and some <strong>in</strong>dependent technocrats <strong>in</strong> the micr<strong>of</strong><strong>in</strong>ance area. It<br />

is vital that both Government and the fund<strong>in</strong>g development partners take<br />

equitable part <strong>in</strong> govern<strong>in</strong>g SMART-Cap, and thus the board will function<br />

like a normal corporate board. Strategic board decisions will be reached<br />

by consensus and not a weighted vot<strong>in</strong>g procedure.<br />

16 Proposed name: Salone Micr<strong>of</strong><strong>in</strong>ance And Rural Trades <strong>Capacity</strong> Enhancement (SMART-<br />

Cap)<br />

17 For advocacy, lobby and <strong>in</strong>formation dissem<strong>in</strong>ation<br />

page 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!