1. INTRODUCTION
1. INTRODUCTION
1. INTRODUCTION
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
likely damages to crops and plantations, and information<br />
about ways to protect the same.<br />
The NGOs and other relief organisations are informed<br />
about the resources of the department<br />
A officer has been designated as Nodal Officer for<br />
Disaster Management<br />
Sources of materials required for response operations have<br />
been identified<br />
9)Preparedness Checklist for Animal Husbandry Department :<br />
Preparedness measures taken<br />
The department is familiar with disaster response plan and<br />
disaster response procedures are clearly defined<br />
Orientation and training for disaster response plan and procedures<br />
undertaken Special skills required during emergency operations<br />
imparted to the officials and the staff.<br />
Reviewed and updated<br />
· Precautionary measures and procedures<br />
· the precautions to be taken to protect equipment<br />
· the post-disaster procedures to be followed.<br />
Hospital staff aware of which hospital rooms are damage-proof.<br />
All veterinary hospitals and centres’ staff have been<br />
informed about the possible disasters, likely damages and<br />
effects, and information about ways to protect life,<br />
equipment and property.<br />
An area of the hospital identified for receiving large numbers of<br />
livestock.<br />
Emergency admission procedures with adequate record keeping<br />
developed.<br />
A officer has been designated as Nodal Officer for DM<br />
Sources of materials required for response operations have identified<br />
Details/Remarks<br />
6. MITIGATION STRATEGIES :<br />
1) Requirements of Ahmednagar District for responding to Possible Disaster Events<br />
Sr.No. Material / Equipment Qty.Reqd. Remarks<br />
<strong>1.</strong> Telephone ( with STD connection) 3 One number with three line<br />
transfer system for DCR<br />
2. EPBX System (2x20) 1<br />
3. Hot Line 1 Between collector Office<br />
and S.P.<br />
4. Mobile Phones 1 For use of Collector<br />
5. Rubber Boats 6 To be maintained by ZP<br />
C:\DOCUME~1\ADMINI~1\LOCALS~1\Temp\C.Lotus.Notes.DataRevised Grain Bank