EA New Homes Measures Guide - Earth Advantage
EA New Homes Measures Guide - Earth Advantage
EA New Homes Measures Guide - Earth Advantage
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2012 <strong>Earth</strong> <strong>Advantage</strong> Residential<br />
<strong>Measures</strong> Resource <strong>Guide</strong><br />
1.2.4<br />
Existing Trees of 4" Caliper or Larger Saved<br />
Accountability Form: General<br />
Energy<br />
Materials<br />
Water<br />
0 0 1 0 1<br />
Description: This measure rewards the preservation of trees already on site. Points are awarded for one mature tree saved. Mature tree is<br />
defined as a tree in good health that is not considered a nuisance or invasive species, 4" caliper or larger at 4 feet above the ground. A<br />
second point can be awarded for three or more trees saved on the lot. This measure is awarded on a per lot basis. A typical application<br />
would be fencing at the drip line of a mature tree or fencing off the area around the tree to remain undisturbed by equipment.<br />
Health<br />
Land<br />
Benefit: Trees contribute to the economic and ecological value of a site. In addition to their physical beauty, trees provide wildlife habitat,<br />
help manage the flow of stormwater, clean the air, and they protect critical features such as stream buffers or hillsides. In addition,<br />
properly trimmed and positioned shade trees protect the house from the hot summer sun, reducing cooling loads. Considering the effects<br />
on energy usage, erosion control, pollution, and wildlife habitat, a single mature tree provides substantial annual and resale value.<br />
Verification: This measure applies to single lots. However, points can be awarded to all lots in a development if a significant number of<br />
trees or trees of significant value (heritage trees) have been preserved in a green space that is available to all residents.<br />
1.2.5<br />
Accountability Form: General Energy Health Land Materials Water<br />
Stormwater Control: Bio-retention system onsite- 100 percent of<br />
0 0 2 0 1<br />
lot/development<br />
Description: Develop an on-site infiltration system for rainwater for the lot and development, exclusive of the footprint of the house roof.<br />
This is a water drainage system that routes water into the soil and groundwater of the house site. The swale must contain plants whose<br />
roots and associated organisms cleanse the water as it percolates through the root zone. Bio-swales and rain gardens are examples of this<br />
approach. The main goal is to keep rainwater that arrives on the site to stay on the site. An additional goal is to maintain runoff flows,<br />
runoff durations and runoff volumes after construction as closely as possible to the natural condition of the site and minimize adverse<br />
effect on stream flows. System should be sized to hold runoff of a 2-year storm event.<br />
Benefit: Every building affects the natural function of a site's hydrology, particularly its processing of stormwater and the way groundwater<br />
is replenished. One way to reduce this impact is to allow the stormwater that falls on the site to soak into the soil instead of allowing it to<br />
flow off-site. This can decrease annual runoff volume by as much as 50 percent. It also reduces the potential for flooding and erosion and<br />
helps recharge groundwater sources for streams and wells.Bio-retention protects the water quality in local streams by preventing silt,<br />
pollutants, and untreated sewage from washing into these bodies during heavy rains. This helps protect the habitats of endangered<br />
aquatic species. In addition to being environmentally responsible, allowing water to soak into the ground is resource efficient. Re-use of<br />
this water could lower irrigation costs.<br />
Verification: <strong>EA</strong> Rater will visually inspect stormwater storage features on the site. In subdivisions, <strong>EA</strong> rater will locate all retention systems<br />
and verify how many exist. Plant material must be positioned in the swale or along the sloped sides of the swale. This measure INCLUDES<br />
On-site Infiltration of Roof Drains, so that measure should be taken in addition to this one.<br />
Page 4 of 70