21.03.2015 Views

Environment Report - Santos

Environment Report - Santos

Environment Report - Santos

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contents<br />

5.11 Typical mainline construction ROW cross section 35<br />

5.12 Onshore pipeline construction ROW 36<br />

5.13 Onshore pipeline and trench cross-section 39<br />

5.14 Typical open trench isolation crossing (dam and pump method) 40<br />

5.15 Typical open trench isolation crossing (flume pipe method) 41<br />

5.16 Typical MLV site layout 42<br />

5.17 Project development timeline 44<br />

6.1 Sea surface temperature satellite image, showing cold water upwelling off the Bonney Coastline<br />

in March 1995 46<br />

6.2 Seabed habitat classification of the Casino pipeline route 48<br />

6.3 Blue whale sightings between February 1998 - May 2002 50<br />

6.4 Geology of the Port Campbell area 65<br />

6.5 Idealised geological profile of the HDD shore crossing 68<br />

6.6A Vegetation units 72<br />

6.6B Vegetation units (Great Ocean Road to Curdie Vale to Port Campbell Road) 73<br />

6.6C Vegetation units (Curdie Vale to Port Campbell Road to Campbells Creek) 74<br />

6.6D Vegetation units (Campbells Creek to the TXU WUGS facility) 75<br />

6.7 Ecological Vegetation Classes of the Port Campbell area 76<br />

6.8 HDD shore crossing site 81<br />

6.9 Curdie Vale to Port Campbell Road HDD crossing 82<br />

6.10 Smokey Point Road open trenched crossing 82<br />

6.11 Cheynes Road South open trenched crossing 83<br />

6.12 Campbells Creek open trenched crossing 83<br />

6.13 Cobden to Port Campbell Road HDD crossing 84<br />

6.14 Landuse and infrastructure 90<br />

6.15 Corangamite Shire planning schemes and overlays 91<br />

6.16 Residences within 500m of the proposed Casino pipeline 105<br />

7.1 <strong>Santos</strong>’ <strong>Environment</strong>, Health and Safety Management System 111<br />

Tables<br />

1.1 Casino Gas Field Development EIA Project Team 4<br />

2.1 Summary of key regulatory approvals 5<br />

2.2 Subsequent approvals 9<br />

3.1 Key stakeholders 12<br />

3.2 Casino Gas Field Development consultation summary 13<br />

5.1 Pipeline and well design specifications 20<br />

5.2 Preliminary assessment of shore crossing options 23<br />

5.3 Assessment of onshore route options 26<br />

5.4 Length of preferred onshore pipeline route following new, existing or proposed easements 30<br />

5.5 Depths of cover along the proposed pipeline route 39<br />

5.6 Proposed road crossing methods 41<br />

6.1 Climatic averages for southwest Victoria 45<br />

6.2 Average rainfall and raindays in Port Campbell (1885 to 1993) 45<br />

Casino Gas Field Development xxv

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!