23.03.2015 Views

2008 - 2009 - Pinsent Masons Water Yearbook 2012 - 2013

2008 - 2009 - Pinsent Masons Water Yearbook 2012 - 2013

2008 - 2009 - Pinsent Masons Water Yearbook 2012 - 2013

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHINA<br />

PART 3(ii): COMPANY ANALYIS LOCAL/REGIONAL PLAYERS<br />

GUOZHEN ENVIRONMENTAL PROTECTION<br />

Guo Zhen Environmental Protection (GZEP, formerly called the Anhui Guozhen Environmental<br />

Protection Energy-Saving Technology Company) is owned by the Anhui Guozhen Group Ltd. Co. This<br />

is a privately held company based in Anhui Province that has net assets of CNY400million. GZEP has<br />

been the lead builder for some 30 wastewater treatment plants and has been involved in the<br />

construction of over 200 other wastewater treatment plants.<br />

A total of 10 BOT and TOT contract awards have been identified, the first five of which were<br />

generating revenues of approximately USD13million pa in 2005. These contracts serve approximately<br />

6.0million people.<br />

2000: BOT for the Bozhou City Wastewater Treatment Plant with a capacity of 80,000 tonnes/day.<br />

2001: 15 year operating contract for two wastewater treatment plants in Shenzhen City (total city<br />

population of 1.285million in 2005).<br />

2001: BOT project in Guangdong Province, the Xinhui East Wastewater Treatment Plant. The<br />

wastewater treatment plant serving the Xinhui District of Jiangmen (Guangdong Province) opened in<br />

October 2003. The district invested CNY36million (EUR4million) for the land and a supporting network<br />

of sewage pipelines. Guozhen is responsible for the WWTW’s CNY42million investment and<br />

operation. The city has to pay CNY0.67 (EUR0.07) for each tonne of sewage treated, compared with<br />

CNY1.2 (EUR0.13) it would have spent if it had conducted its own investing and management. The<br />

municipality had estimated that the 80,000m³ per day WWTW would have cost CNY280million to<br />

develop and finance. Xinhui had a population of 735,500 in 2005.<br />

2003: First BOT project in Anhui Province, the Zhuzhuanjing Wastewater Treatment Plant.<br />

2003: 30 year TOT for Xu Zhou wastewater treatment plant with capacity 165,000 tonnes/day (city<br />

population of 1.662million in 2005).<br />

2004: 20 year TOT for the Changsha Second Wastewater Treatment Plant with a capacity of 140,000<br />

tonnes/day (city population of 2.051million in 2005).<br />

2005: The management of the Shenzhen Caopu Sewage Treatment Plant was taken over in April. The<br />

treatment capacity of Shenzhen Buji Caopu Sewage Treatment Plant is 150,000 m 3 per day.<br />

2007: BOT for Lankao County (25,000m 3 per day), Suqian City Yanghe (10,000 m 3 per day) and<br />

Wuhu City Tranmenshan (Phase 1, 60,000m 3 per day).<br />

Contact Details<br />

Name: GuoZhen Environmental Protection<br />

Address: 699 Changjing West Road<br />

Hefei, Anhui, China<br />

Tel: 0551-531 9529<br />

Fax:<br />

0551-532 2901<br />

Web:<br />

www.gzep.com.cn<br />

Jian Xingchao (Chief Engineer)<br />

Wu Hao (Vice President)<br />

Ms Duan Zhuan Jian (Chairman)<br />

316<br />

<strong>Pinsent</strong> <strong>Masons</strong> <strong>Water</strong> <strong>Yearbook</strong> <strong>2008</strong>-<strong>2009</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!