2. Execution of Tasks<br />

page 22<br />

Analysis”. This was disseminated in the agreed final version to the Beneficiaries on 31 July<br />

2006 and is attached in Appendix 1.<br />

Most of the gaps identified in this UNDP/GEF DRP analysis for the 3 Sava countries could be<br />

addressed during several activities within this DRP Component. In particular these are:<br />

> Groundwater (1 st joint workshop with CARDS Sava project): delineation of Water<br />

Bodies, Risk Assessment, information gaps;<br />

> Surface water (1 st joint workshop with CARDS Sava project, Vienna workshop):<br />

hydromorphological alterations, point and diffuse sources (data management,<br />

pressure analysis, Risk Assessment, fulfillment of relevant EU Directives - Urban<br />

Wastewater Dir.);<br />

> GIS (Vienna workshop): Preparation of basis data, Water Body delineation, Risk<br />

Assessment, presentation of results.<br />

2.3.2. Task 1.2.: Assistance on selected WFD Issues<br />

Objective of Task 1.2 was to support the three Sava countries in their concrete WFD reporting,<br />

addressing selected issues and using different assistance tools.<br />

The UNDP/GEF DRP assistance was sub-divided into the following 3 sub-tasks:<br />

2.3.2.1. Task 1.2.1. Transfer of international experience with WFD reporting via two<br />

in-situ working sessions closely linked to the CARDS Sava project:<br />

First Workshop by the EC Regional CARDS project "Pilot River Basin Plan for the Sava River<br />

Basin” and UNDP-GEF “Sava project” from 31 May – 2 June 2006 in Belgrade<br />

The workshop was jointly organized together with the CARDS project. Two DRP Consultants<br />

(Eleftheria Kampa, Ecologic, and Andreas Scheidleder, Umweltbundesamt) participated as<br />

international experts from the GEF Component. The main topics of this workshop were<br />

> Groundwater body delineation and characterisation - with special focus on karstic<br />

aquifers<br />

> Hydromorphological risk assessment and AWB/HMWB provisional identification<br />

On 1 June, E. Kampa and A. Scheidleder gave comprehensive presentations and played an<br />

active role during the workshop discussions.<br />

Second Workshop by the EC Regional CARDS project "Pilot River Basin Plan for the Sava River<br />

Basin” and UNDP-GEF “Sava project” on the Preparation of WFD Characterisation Report (3 – 6<br />

October 2006 in Sarajevo)<br />

UNDP/GEF DRP Consultants Eleftheria Kampa (Ecologic) and Franko Humer (Umweltbundesamt)<br />

participated as international GEF Component experts. The main topics of this workshop were:<br />

> Groundwater (risk assessment-isotopes karst)<br />

> Reporting issues for the provisional identification of HMWB<br />

On 5 October, E. Kampa and F. Humer presented and discussed the above listed topics.<br />

The Mission Reports and Lists of Participants for both workshops are included within Appendix<br />