- Page 1 and 2: March 2007 DEVELOPMENT OF SAVA RIVE
- Page 3: PREFACE The UNDP/GEF Danube Regiona
- Page 9 and 10: EXECUTIVE SUMMARY Sava River Basin
- Page 11 and 12: Sava River Basin Management Plan -
- Page 13 and 14: 2. EXECUTION OF TASKS Sava River Ba
- Page 15 and 16: Sava River Basin Management Plan -
- Page 17 and 18: Sava River Basin Management Plan -
- Page 19 and 20: Sava River Basin Management Plan -
- Page 21 and 22: 2.2. General results Sava River Bas
- Page 23 and 24: Sava River Basin Management Plan -
- Page 25 and 26: Sava River Basin Management Plan -
- Page 27 and 28: Sava River Basin Management Plan -
- Page 29 and 30: Table 2 Suitability of Types of Mea
- Page 31 and 32: 2.5. Results of Task 4 Sava River B
- Page 33: 3. CONCLUSIONS Sava River Basin Man
- Page 37 and 38: APPENDIX 1 DEVELOPMENT OF SAVA RIVE
- Page 39 and 40: Presentations: A. Scheidleder: •
- Page 41 and 42: ANNEX 1: Report on WFD Gap Analysis
- Page 43 and 44: PART I WFD templates - Meta data an
- Page 45 and 46: groundwater bodies will be finished
- Page 47 and 48: 5 Annex I : Summary of SAVA WFD Tem
- Page 49 and 50: Template Contact Contact 9-Reservoi
- Page 51 and 52: Template Contact Contact person Dat
- Page 53 and 54: Bosnia and Herzegovina Template Con
- Page 55 and 56: Template Contact Contact 5-Refconds
- Page 57 and 58:
Template Contact Contact 8-WB_River
- Page 59 and 60:
Template Contact Contact 11- Hydrom
- Page 61 and 62:
Socio-Economic Analysis at the Sava
- Page 63 and 64:
different ministries or institution
- Page 65 and 66:
Main gaps / difficulties Bosnia & H
- Page 67 and 68:
Anticipating future WFD implementat
- Page 69 and 70:
ANNEX 2.1: UNDP/GEF Consultants Mis
- Page 71 and 72:
No . CARDS PILOT RIVER BASIN PLAN F
- Page 73 and 74:
etter to divide those big groundwat
- Page 75 and 76:
internally clarified within the UND
- Page 77 and 78:
Annex 2.3 Minutes from the Vienna W
- Page 79 and 80:
AGENDA: Tuesday 26 September 2006 I
- Page 81:
15:15 - 17:00 Group Pollution Group
- Page 84 and 85:
Sava RBMP Pilot Project: Report on
- Page 86 and 87:
Sava RBMP Pilot Project: Report on
- Page 88 and 89:
Sava RBMP Pilot Project: Report on
- Page 90 and 91:
Sava RBMP Pilot Project: Report on
- Page 92 and 93:
Sava RBMP Pilot Project: Report on
- Page 94 and 95:
Sava RBMP Pilot Project: Report on
- Page 96 and 97:
Sava RBMP Pilot Project: Report on
- Page 98 and 99:
Sava RBMP Pilot Project: Report on
- Page 100 and 101:
Sava RBMP Pilot Project: Report on
- Page 102 and 103:
Sava RBMP Pilot Project: Report on
- Page 104 and 105:
Sava RBMP Pilot Project: Report on
- Page 106 and 107:
Sava RBMP Pilot Project: Report on
- Page 108 and 109:
Sava RBMP Pilot Project: Report on
- Page 110 and 111:
Sava RBMP Pilot Project: Report on
- Page 112 and 113:
Sava RBMP Pilot Project: Report on
- Page 114 and 115:
Sava RBMP Pilot Project: Report on
- Page 116 and 117:
B. Key Transboundary Issues (Task 2
- Page 118 and 119:
Sava RBMP Pilot Project: Report on
- Page 120 and 121:
Sava RBMP Pilot Project: Report on
- Page 122 and 123:
Sava RBMP Pilot Project: Report on
- Page 124 and 125:
Floods and Droughts Invasive Specie
- Page 126 and 127:
C. Topics of Measures (Task 3) Sava
- Page 128 and 129:
Sava RBMP Pilot Project: Report on
- Page 130 and 131:
B. Key Transboundary Issues (Task 2
- Page 132 and 133:
• Governance and Organisation Sav
- Page 134 and 135:
C. Topics of Measures (Task 3) Sava
- Page 136 and 137:
Sava RBMP Pilot Project: Report on
- Page 138 and 139:
Sava RBMP Pilot Project: Report on
- Page 140 and 141:
Exploitation of Fisheries and other
- Page 142 and 143:
• Governance and Organisation Tra
- Page 144 and 145:
C. Topics of Measures (Task 3) Sava
- Page 146 and 147:
Sava RBMP Pilot Project: Report on
- Page 148 and 149:
B. Key Transboundary Issues (Task 2
- Page 150 and 151:
C. Topics of Measures (Task 3) Sava
- Page 152 and 153:
Sava RBMP Pilot Project: Report on
- Page 154 and 155:
Sava RBMP Pilot Project: Report on
- Page 156 and 157:
Sava RBMP Pilot Project: Report on
- Page 158 and 159:
ANNEX IV SARAJEVO WORKSHOP AGENDA A
- Page 160 and 161:
Sava RBMP Pilot Project: Report on
- Page 162 and 163:
17 SRB 18 Country/ Institution Sava
- Page 164 and 165:
Sava RBMP Pilot Project: Report on
- Page 166 and 167:
Sava RBMP Pilot Project: Report on
- Page 168 and 169:
Sava RBMP Pilot Project: Report on
- Page 170 and 171:
8 Sava RBMP Pilot Project: Report o
- Page 172 and 173:
Reporting Sheet Code 5. Environment
- Page 174 and 175:
Reporting Sheet Code 12 Sava RBMP P
- Page 176 and 177:
DRAFT - Road Map for Sava River Bas
- Page 178 and 179:
DRAFT - Road Map for Sava River Bas
- Page 180 and 181:
DRAFT - Road Map for Sava River Bas
- Page 182 and 183:
Activities DRAFT - Road Map for Sav
- Page 184 and 185:
DRAFT - Road Map for Sava River Bas
- Page 186 and 187:
Issues related to SRB MP (WFD) Oper
- Page 188 and 189:
Issues related to SRB MP (WFD) Oper
- Page 190 and 191:
Issues related to SRB MP (WFD) Oper
- Page 192 and 193:
DRAFT - Road Map for Sava River Bas
- Page 194 and 195:
DRAFT - Road Map for Sava River Bas
- Page 196 and 197:
DRAFT - Road Map for Sava River Bas
- Page 198 and 199:
DRAFT - Road Map for Sava River Bas
- Page 200 and 201:
Country/ Institution DRAFT - Road M