DEVELOPMENT OF SAVA RIVER BASIN MANAGEMENT ... - ICPDR
DEVELOPMENT OF SAVA RIVER BASIN MANAGEMENT ... - ICPDR
DEVELOPMENT OF SAVA RIVER BASIN MANAGEMENT ... - ICPDR
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3.1 Workshops in cooperation with <strong>SAVA</strong> Cards project<br />
The first joint workshop together with the CARDS <strong>SAVA</strong> project was held at the end of May in<br />
Belgrade. The main topics were Groundwater and Hydromorphology.<br />
The second joint workshop is planned for October; its topics are still to be agreed.<br />
3.2 Workshop in Vienna<br />
As highlighted during the Inception Phase an important tool for the whole WFD implementation<br />
process across all specific topics is GIS. Therefore it is suggested to put GIS as one of the main topics<br />
on the agenda of the workshop in Vienna.<br />
Based on the evaluation of the WFD specific topics during the Inception Phase and from the Sava meta<br />
data templates it is proposed to further focus on Point and Diffuse Source Pollution (with consideration<br />
of the Urban Waste Water Directive) and on Risk Assessment.<br />
The work programme for the Vienna Workshop is proposed as follows:<br />
GIS: practical examples of WFD implementation<br />
Point and diffuse sources:<br />
Data management (including fulfilment of Urban Waste Water Directive)<br />
Pressure analysis<br />
Risk Assessment<br />
The Vienna workshop is planned for September 2006. A specific date and an invitation will be sent out<br />
by the end of June 2006.<br />
3.3 Electronic Workshop follow-up<br />
This is meant as a communication service, where the items and procedures presented and discussed<br />
in the previous workshops and meetings can be further checked and improved during this DRP<br />
component period.<br />
4 Conclusions<br />
Most of the gaps identified in this GEF/DRP analysis for the 3 Sava countries will be addressed during<br />
several activities within this project. In particular these are:<br />
Groundwater (1 st joint workshop with CARDS Sava project): delineation of Water Bodies,<br />
Risk Assessment, information gaps<br />
Surface water (1 st joint workshop with CARDS Sava project, Vienna workshop):<br />
hydromorphological alterations, point and diffuse sources (data management, pressure<br />
analysis, Risk Assessment, fulfillment of relevant EU Directives (UWWD))<br />
GIS (Vienna workshop): preparation of basis data, Water Body delineation, Risk Assessment,<br />
presentation of results.<br />
The topics of the 2 nd joint workshop with the CARDS Sava project are not arranged yet. The above list<br />
will be finalised after determining the programme of this 2 nd joint workshop.<br />
10