References<br />

page 32<br />

steps such as the Sava Basin Analysis need to be executed already in 2007), and the limited<br />

availability of resources on the national level to provide the outputs needed. It was concluded<br />

that the Sava Commission has to very soon clarify the responsibilities and the share of work.<br />

The Review of the Public Participation Strategy and the Sava RBMP Public Information<br />

and Consultation Plan revealed that PP is still not addressed by the SC, and that the PP<br />

strategy and the related Sava Plan need to be urgently adopted by the Sava Commission,<br />

including its implementation plan. Both documents were welcomed and accepted by all<br />

Beneficiaries (the final version is also given in Appendix 3). The workshop results were<br />

presented by some participants at the subsequent PEG RBM meeting and accepted.