Download PDF - University of Idaho Library
Download PDF - University of Idaho Library
Download PDF - University of Idaho Library
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Underclassmen<br />
After dominating the<br />
headlines for months.<br />
a 51.5 million out-<strong>of</strong>-court<br />
settlement and a new ro<strong>of</strong> ended<br />
The sa~a <strong>of</strong> the 'leaRY dome'<br />
I<br />
I was fin 11ly settled.<br />
Alter being tangled in a maze <strong>of</strong><br />
lawsuits, CQuntersuits and arbitration,<br />
a $1.5 million Qut-af-court settlement<br />
ended a year and a half <strong>of</strong><br />
litigation over the leaking Kibbie Dome<br />
rool.<br />
Patrick Sullivan, the lawyer handling<br />
the case lor the university, said the<br />
agreement provided for a lump-sum<br />
payment to the university and prohibits<br />
all parties involved from Wing further<br />
claims.<br />
David McKinney, Ul Financial Vice<br />
President, said that while the $1.5 will<br />
not cover the costs <strong>of</strong> repairing the<br />
dome, it will save the university money<br />
in the long run.<br />
"I saw an awiullot <strong>of</strong> future costs from<br />
consultants' and attorneys' fees if we'd<br />
pursued this in court. And I'm not sure<br />
the reward would go up," McKinney<br />
said.<br />
The university was asking for $11.2<br />
million from the dome's builder, Emerick<br />
Construction <strong>of</strong> Portland, and its architect,<br />
Cline Smull, Hamill Associates<br />
<strong>of</strong> Boise.<br />
In a suit filed in June <strong>of</strong> 1981, the<br />
university claimed that defects in the<br />
workmanship caused the dome ro<strong>of</strong> to<br />
leak and, that the design was in<br />
violation <strong>of</strong> <strong>Idaho</strong>'s Uniform Building<br />
Code.<br />
The action spawned a confusing array<br />
<strong>of</strong> counter-suits that drew Emerick's in<br />
~urance company - Aetna Casualty<br />
and Surety - and a number 01 subcontractors<br />
and suppliers into the fray.<br />
Meanwhile, the university had been<br />
paying lor dome repairs out <strong>of</strong> a capital<br />
improvement fund.<br />
About $650,000 was spent on temporary<br />
ro<strong>of</strong> repairs, and during the summer<br />
a new, permanent rool was built at a<br />
cost <strong>of</strong> nearly $1 million.<br />
In the fall, eight contractors were<br />
hired to repair water damage inside the<br />
dome and correct building code<br />
violations, adding another $560,000 to<br />
the repair bill.<br />
The final price tag for fiXing the ro<strong>of</strong>,<br />
including fees for attorneys and consultants<br />
totaled well over $2 million according<br />
to McKinney. 0<br />
Laura Wat!!'rman, Jr., Caldwell<br />
Lisa Wat!!'rs, Fr., Thomasville, Ga.<br />
Susan Watkins. Fr., Boi.~e<br />
Barbara Weber, Fr., Kennewick, Wash.<br />
Douglas Weber, Soph., Juneau, Ala.<br />
Teresa Weber, Jr., <strong>Idaho</strong> Falls<br />
Dennir Weigt, Soph., Twin Falls<br />
Brian Wernecke, Fr" Mascow<br />
Jell Wescott Jr., Sandpoint<br />
Joon West. Fr., Nampa<br />
T1m We,S1ermonn. Fr., Twin Falls<br />
James Wheat, Soph., <strong>Idaho</strong> Falls<br />
Robert Wheaton. NG Sr., Plummer<br />
Snow White, Fr., Pocatello<br />
John Whitten, Soph., Detroit, Mich.<br />
John Wiebe. Fr" Fruitland<br />
Pat Wiese, Fr., Moscow<br />
Maurice Wild, Jr., Santa Clara, Cali!.<br />
Carol Lynn Wiley. Jr., Sandpoint<br />
Pete WiJhl!'lm. Jr., Sandpoint<br />
Sonya WilJrins, Soph., Emmell<br />
Dove WJJJrJson.Fr., Lake Villa, m.<br />
Martina Williamson. Fr., <strong>Idaho</strong> Falls<br />
John Willson. Port Angeles, Wash.<br />
Debbie Wilson. Soph., Weippe<br />
82 Underclassmen