08.05.2015 Views

Annandale Transportation Study - Fairfax County Office of ...

Annandale Transportation Study - Fairfax County Office of ...

Annandale Transportation Study - Fairfax County Office of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Annandale</strong> <strong>Transportation</strong> <strong>Study</strong><br />

Alternative 5<br />

Figure 14d<br />

1<br />

2<br />

Between John Marr and Evergreen/Holbrook, a widening to 6 lanes would be required that is nearly identical to Alternative 2, with<br />

much the same impact including the removal <strong>of</strong> the Service Drives in this section, though more <strong>of</strong> the existing pavement could be used<br />

because the dual westbound left turn lanes at John Marr are no longer needed.<br />

No change in access is proposed in this section.<br />

1. Carmico Drive is realigned slightly to align with the mid block unsignalized median break opposite the shopping center driveway.,<br />

which could include a connection to the building in the SW quadrant <strong>of</strong> the Carmico / Little River Turnpike intersection.<br />

2. The existing service drive system along Little River Turnpike ends to the east <strong>of</strong> Evergreen / Hillbrook and the six-lane widening<br />

project ends with a transition from six lanes divided to four lanes divided east <strong>of</strong> Evergreen / Hillbrook .

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!