16.05.2015 Views

2008 Annual Monitoring Report (pdf 10.9MB) - Bolsa Chica ...

2008 Annual Monitoring Report (pdf 10.9MB) - Bolsa Chica ...

2008 Annual Monitoring Report (pdf 10.9MB) - Bolsa Chica ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Bolsa</strong> <strong>Chica</strong> Lowlands Restoration <strong>Monitoring</strong><br />

<strong>2008</strong> <strong>Annual</strong> <strong>Report</strong><br />

y 3 /year) for the second year after the inlet was to be connected to the ocean, for a total of<br />

approximately 230,000 m 3 (300,000 y 3 ) over the first two years. The predicted flood shoal location is<br />

illustrated in Figure 2-1. Investigations were completed to assess the true rate of shoal accretion and<br />

distribution pattern of flood shoal development.<br />

Full Tidal<br />

Basin (Phase I)<br />

Modeled Shoal Area<br />

Tidal Inlet<br />

Scale 1’’= 1,800’<br />

Figure 2-1. Predicted flood shoal area (cited from M&N 1999)<br />

Methodology<br />

The rate and distribution of sand accretion in the FTB inlet has been assessed during the first two<br />

monitoring years on January 19, 2007, June 27, 2007, January 10, <strong>2008</strong>, and July 1, <strong>2008</strong>. After the<br />

January 2007 survey it became clear that a larger area needed to be surveyed to capture the extent of<br />

the shoaling, therefore all following surveys extended a considerable distance further to the north. A<br />

survey was also conducted on December 23, <strong>2008</strong> by the maintenance dredging contractor hired to<br />

remove the accumulated sand from the inlet during the <strong>2008</strong>/2009 winter season. This survey was<br />

performed by the dredging contractor’s surveyor, CLE Engineering, Inc., and was intended to<br />

document the pre-dredge bathymetric condition.<br />

The surveys were conducted from a small survey vessel with sub-meter accurate differential global<br />

positioning system (dGPS) and a survey-grade SyQuest Hydrobox ® fathometer. Land surveying was<br />

conducted using a total station to complete areas that were too shallow to conduct hydrographic<br />

surveys during the various survey intervals. The bathymetric survey area was previously presented in<br />

Figure 1-1. The methodology for the CLE survey in December <strong>2008</strong> was comparable to that<br />

completed by M&A, as described above. The December <strong>2008</strong> survey area did not cover the western<br />

Merkel & Associates, Inc. 100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!