<strong>Bolsa</strong> <strong>Chica</strong> Lowlands Restoration <strong>Monitoring</strong><br />

<strong>2008</strong> <strong>Annual</strong> <strong>Report</strong><br />

First, consideration should be given to dredging to the permitted depth of the final engineering design<br />

depths to extend the period between maintenance events. Dredging at the time of initial construction<br />

was not completed to full design depths within the maintenance basin. If deepening of the<br />

maintenance basin were completed, this would garner additional time between dredging events and<br />

would improve dredging efficiency by capturing a greater volume of sediment in a more localized and<br />

recoverable area nearer the inlet.<br />

Second, the pre-dredging contracting process can consume a considerable period of time and thus work<br />

should be completed to streamline and pre-prepare to the maximum extent practical prior to<br />

maintenance triggers being tripped. This would allow for a reduced period over which the system<br />

functions in an impaired condition prior to completing maintenance dredging. To accomplish this<br />

would require: preparation of the majority of the plans and specifications, completion of permitting<br />

based on a maintenance basin plan and dredge volume range, preparation of bid and contract<br />

documents, and obtaining maximum flexibility for the dredging window of work.<br />

Merkel & Associates, Inc. 142