<strong>Siting</strong> <strong>Study</strong><br />

<strong>Boardman</strong> <strong>to</strong> <strong>Hemingway</strong> <strong>Transmission</strong> <strong>Line</strong> <strong>Project</strong><br />

determined more reasonable than the West Route. Shifting the southern segment of the East Route south<br />

of the sage-grouse lek and buffer (BA13-MA2 revised <strong>to</strong> BA13-BA14-BA16-MA2) resulted in the lek<br />

being screened by existing <strong>to</strong>pography but did not change the route’s construction and engineering<br />

difficulty. As a result, the (revised) East Route, BA10-BA11-BA13-BA14-BA16-MA2 (comprising CAP<br />

routes C4, C8, C41, S9, and S19) was recommended as more reasonable than the West Route, BA10-<br />

BA20-MA1-MA2 (CAP routes S20 and S21).<br />

Table 3.3.10-1. Burnt River Mileage Summary of Permitting and Construction Difficulty and<br />

Mitigation Cost<br />

Permitting Difficulty<br />

Construction Difficulty<br />

Mitigation Cost<br />

West Route<br />

(BA10-BA20-MA1-MA2)<br />

Length in Miles<br />

East Route<br />

(BA10-BA11-BA13-MA2)<br />

Low 0.0 0.1<br />

Moderate 26.6 35.6<br />

High 9.5 6.2<br />

Exclusion 0.0 0.1<br />

Low 5.6 9.0<br />

Moderate 15.0 16.2<br />

High 15.5 16.7<br />

Low 0.0 1.9<br />

Moderate 36.1 39.8<br />

High 0.0 0.2<br />

August 2010 3-56