Siting Study - Boardman to Hemingway Transmission Line Project
Siting Study - Boardman to Hemingway Transmission Line Project
Siting Study - Boardman to Hemingway Transmission Line Project
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Siting</strong> <strong>Study</strong><br />
<strong>Boardman</strong> <strong>to</strong> <strong>Hemingway</strong> <strong>Transmission</strong> <strong>Line</strong> <strong>Project</strong><br />
determined more reasonable than the West Route. Shifting the southern segment of the East Route south<br />
of the sage-grouse lek and buffer (BA13-MA2 revised <strong>to</strong> BA13-BA14-BA16-MA2) resulted in the lek<br />
being screened by existing <strong>to</strong>pography but did not change the route’s construction and engineering<br />
difficulty. As a result, the (revised) East Route, BA10-BA11-BA13-BA14-BA16-MA2 (comprising CAP<br />
routes C4, C8, C41, S9, and S19) was recommended as more reasonable than the West Route, BA10-<br />
BA20-MA1-MA2 (CAP routes S20 and S21).<br />
Table 3.3.10-1. Burnt River Mileage Summary of Permitting and Construction Difficulty and<br />
Mitigation Cost<br />
Permitting Difficulty<br />
Construction Difficulty<br />
Mitigation Cost<br />
West Route<br />
(BA10-BA20-MA1-MA2)<br />
Length in Miles<br />
East Route<br />
(BA10-BA11-BA13-MA2)<br />
Low 0.0 0.1<br />
Moderate 26.6 35.6<br />
High 9.5 6.2<br />
Exclusion 0.0 0.1<br />
Low 5.6 9.0<br />
Moderate 15.0 16.2<br />
High 15.5 16.7<br />
Low 0.0 1.9<br />
Moderate 36.1 39.8<br />
High 0.0 0.2<br />
August 2010 3-56