14.06.2015 Views

(H-SAF) PROJECT PLAN - Version 2

(H-SAF) PROJECT PLAN - Version 2

(H-SAF) PROJECT PLAN - Version 2

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

H-<strong>SAF</strong> Project Plan 2.0, October 2007 - Update PP-2.2, 10 April 2008 - Index and Lists Page 8<br />

7. The Hydrological validation programme (WP-5000) - Cluster-4 114<br />

7.1 Introduction 114<br />

7.2 The Education and Training programme (WP-5100) 115<br />

7.3 The impact study programme 117<br />

7.3.1 Generalities 117<br />

7.3.2 Impact studies in Belgium (WP-5200) 119<br />

7.3.3 Impact studies in Finland (WP-5300) 119<br />

7.3.4 Impact studies in France (WP-5400) 120<br />

7.3.5 Impact studies in Germany (WP-5500) 121<br />

7.3.6 Impact studies in Italy (WP-5600) 122<br />

7.3.7 Impact studies in Poland (WP-5700) 123<br />

7.3.8 Impact studies in Slovakia (WP-5800) 123<br />

7.3.9 Impact studies in Turkey (WP-5900) 124<br />

7.3.10 Typical activities implied by the impact studies 125<br />

7.4 Reporting 126<br />

7.5 Summary description of test sites 126<br />

7.6 Programme schedule of WP-5000 152<br />

8. Risk analysis and management 156<br />

8.1 General approach 156<br />

8.2 Specific risk analysis 156<br />

Reference to the Appendix 163<br />

Appendix - Work Package Description sheets (WPD) and Deliverables (separate doc. of 147 pages)<br />

A.1 List of Work Package Description sheets<br />

A.2 Work Package Description sheets<br />

A.3 List of Deliverables from WP’s and their location in H-<strong>SAF</strong> documentation<br />

List of Tables<br />

Table 01 Composition of the H-<strong>SAF</strong> Consortium 18<br />

Table 02 Required satellite-derived H-<strong>SAF</strong> products and satellite data sources 24<br />

Table 03 Backup products generated by a NWP model 25<br />

Table 04 List of undertakings of each Country split by WP up to the 3 rd level - Also list of 32<br />

WPD’s<br />

Table 05 Management components of H-<strong>SAF</strong> 33<br />

Table 06 Composition of the Steering Group as of end-2007 33<br />

Table 07 Events providing anchor points for the work schedule 34<br />

Table 08 List of deliverable documents for the Review meeting and the Workshops 35<br />

Table 09 Evolution of documents supporting meetings and Workshops 36<br />

Table 10 List of main hydrological models to be used for the Hydrological validation<br />

programme<br />

126<br />

List of Figures<br />

Fig. 01 Concept of the hydrological validation Cluster and its relation to Clusters 1 to 3 26<br />

Fig. 02 Countries involved in impact studies / validation of satellite products with use of 26<br />

hydrological models

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!