CHAPTER-2<br />

EIA/EMP OF Shree Shakambari Ferro Alloys <strong>Pvt</strong>. <strong>Ltd</strong>.<br />

Ash Handling and Disposal System<br />

The ash generation will be to the tune of maximum 20% of the coal fed and<br />

therefore the capacity of Ash handling system comes to 1.5 tonnes per hour<br />

whereas the Ash handling plant is designed for 2 tonne per hour capacity.<br />

The Ash storage silo will be of steel made and the capacity planned is for storing<br />

for 16 hours. Therefore capacity of Silo will be 2x16=32 MT and proposed<br />

capacity of steel silo will be 40MT.<br />

ASH Storage Silo<br />

The Silo will be of Steel construction & the capacity planned is for storing for 16<br />

Hrs, therefore capacity of Silo works out to be 2 x 16 = 32 MT, therefore<br />

considering margins the capacity of silo will be 40 MT.<br />

The silo will have dust conditioning system to combat fugitive emissions during<br />

unloading of dust for disposal.<br />

2.8.3 Electrical Installation:<br />

Proposed System:<br />

The Scheme of the electrical power generating for the captive power plant<br />

project consists of one no. 11 KV , 50 Hz, 3 phase, 0.8 PF synchronous generators<br />

having nominal; capacity of 10 MW. The Plant will operate in island mode except<br />

during start ups it will be synchronized with the grid A portion of the power<br />

generated in the turbogenrator will meet the power requirements of the<br />

Auxilairy power requirements of the Power Plant & balance will be exported to<br />

Ferro Alloys. The distribution will be at HT & LT levels. The HT power will be<br />

used in Ferro at 33 Kv & will be stepped up by a Transformer of 11/33 Kv. The<br />

LT power will be used for running Power Plant & Ferro Auxiliaries. There will<br />