CHAPTER-2<br />
EIA/EMP OF Shree Shakambari Ferro Alloys <strong>Pvt</strong>. <strong>Ltd</strong>.<br />
will be replenished every day from the water source like river intake. This water<br />
will be pumped from water tank to furnace through a pipe line. A water header<br />
is used at the furnace to distribute water to various furnace equipment through<br />
pipeline. The return water is collected in a trough and supplied back to the water<br />
tank by gravity.<br />
A cooling tower will be used to cool the return water and the cold water will<br />
then be discharged in to the water tank.<br />
Water from intake will first be treated to remove any impurity and to maintain<br />
the desired pH level so as to avoid the scaling in the pipe line. The water storage<br />
tank will be replenished with this treated water.<br />
B. For CPP<br />
The water system consists of the following sub-systems:<br />
Raw Water System: The area where the power plant will be located, has a good<br />
water potential both in the form of surface water and in the form of underground<br />
water. Source of raw water for captive power plant will be Local River. A<br />
detailed assessment regarding the availability of the water and quality had been<br />
done which ensures the required water is available.<br />
The power plant needs about 250 cum per day raw water for meeting its make<br />
up water requirements.<br />
Circulating Water System: The system caters to the cooling water requirement of<br />
the condenser of the turbo generator, the auxiliaries of the turbogenerator, the<br />
auxiliaries of the steam generators, the auxiliaries of CPP.A three cell, induced<br />
draft cross low cooling tower with all the cell operating will supply the cooling<br />
water for the CPP. The hot water returning from the condenser, the TG and<br />