CHAPTER-2<br />

EIA/EMP OF Shree Shakambari Ferro Alloys <strong>Pvt</strong>. <strong>Ltd</strong>.<br />

vi.Parking<br />

Parking area of 600 sqmtr is provided for truck parking. Separate parking area of<br />

600 sq mtr is provided for car & motorcycle parking near the administrative<br />

building.<br />

2.16 Implementation Schedule<br />

Land measuring 11.47 acre for the proposed project has already been<br />

acquired. Land development for the proposed factory and captive power plant is<br />

under process. Trial runs to be done in the month of December 2010. Considering<br />

the above project implementation period it has been assumed that the unit may<br />

commence its commercial production from January, 2011.<br />

Captive Power Plant:<br />

14 months from Main Plant Order i.e. Boiler and Turbine.<br />

Implementation schedule are shown in Exhibit No2.7A, 2.7B, 2.7C<br />