CHAPTER-2<br />
EIA/EMP OF Shree Shakambari Ferro Alloys <strong>Pvt</strong>. <strong>Ltd</strong>.<br />
breaker, capacitor bank breaker & auxiliary transformer breaker.<br />
These breakers will have control panels by which the power is<br />
monitored and controlled. From these breakers cables are run to<br />
Furnace transformer, capacitor bank & auxiliary transformer<br />
from the respective breakers.<br />
The auxiliary power required at various parts of the plant is<br />
supplied from a power distribution panel (L.T.P.D.B) which is<br />
powered by auxiliary transformer.<br />
L.T Panels are located in the plant at various places nearer to the<br />
equipment for their power supply and control.<br />
Furnace Transformer and its breaker are located near the Furnace<br />
which is connected to its back up breaker located in 11kV <strong>Control</strong><br />
room by cables. The furnace transformer in turn supplies power to<br />
furnace through a copper bus bar.<br />
iii. Water<br />
Water distribution system in the Ferro Alloy plant mainly consists of<br />
a) RCC Water tank<br />
b) Supply & distribution pipe lines<br />
c) Cooling tower<br />
d) Water header.<br />
In the Ferro alloy plant water is mainly required for cooling of furnace<br />
parts. No water is required for process. The water required for cooling of<br />
furnace is 30 cum per day. This is equivalent to the evaporation from the<br />
water storage tank. A tank will be designed to store water required for 10<br />