CHAPTER-2<br />
EIA/EMP OF Shree Shakambari Ferro Alloys <strong>Pvt</strong>. <strong>Ltd</strong>.<br />
shall be interconnected, as per IEEE:80 recommendations & IS:3043. Non-current<br />
carrying parts of all electrical equipments viz., motors, MCCs, PCCs, distribution<br />
boards, control panels, HT switchgears, generators and all lightning fittings shall<br />
also be earthed rigidity to ensure safety.<br />
Cables:<br />
All cables shall be selected to carry the load current under site conditions, with<br />
permissible voltage drop. In addition, high voltage cables shall be sized to<br />
withstand the short circuit current. The following types of cables shall be used.<br />
Power cables for 11 Kv system will be with three core aluminium conductor,<br />
XLPE insulated, screened, armoured and overall PVC sheathed confirming to<br />
IS:7098/IEC:502<br />
The power cables of 1.1 Kv grade will be PVC insulated, aluminum conductor,<br />
inner sheath PVC taped strip/wire armoured with outer sheath of PVC<br />
compound conforming.<br />
The control cables for control/protection/indication circuit of the various<br />
equipment will be of 1.1 Kv grade, PVC insulated annealed high conductivity<br />
stranded copper conductor, inner sheath PVC taped, flat/ round wire armoured<br />
with outer sheathe of PVC compound conforming to latest.<br />
AC Auxiliary Supply:<br />
AC supplies of single and three phase, needed for internal use for several<br />
functions such as Illumination, Battery charging, UPS, Transformers tapchanger<br />
drives, Excitation supply, Power supplies for communication equipment,<br />
Breakers/Disconnect switch motors, space heaters in cubicles, generators and<br />
marshaling kiosis shall be arranged from minimum two supply sources.<br />
ECOMEN LABORATORIES PVT.LTD., LUCKNOW