CHAPTER-2<br />

EIA/EMP OF Shree Shakambari Ferro Alloys <strong>Pvt</strong>. <strong>Ltd</strong>.<br />

2.18.2 Details of work force<br />

TableNo.2.3<br />

S.No Description of Work<br />

Duration No of workers<br />

of work<br />

1 Civil buildings, …………… ……………<br />

Plant foundations<br />

2 Road & drainage …………… ……………<br />

works<br />

3 Furnace building, 12 months 30<br />

Raw<br />

Material handling<br />

system<br />

& other sheds<br />

4 Fabrication & 5 months 20<br />

erection<br />

Of Furnace<br />

5 Electrical Installation 2 months 15<br />

A. Ferro alloy & Ferro Silicon Plant:<br />

Ferro alloy & Ferro Silicon will operate for 3 shifts. The manpower<br />

deployment will be 107 during operational phase.<br />

B) Captive Power Plant:<br />

The plant will operate for 3 shifts. The manpower deployment will be 125<br />

during operational phase.<br />

The total technical executives required are around …….. and technical<br />

manpower will be ……. The manpower required during implementation phase<br />

will be …….<br />