Fig. 16 finally shows the printout <strong>of</strong> the IMRT field, as it is provided by VeriS<strong>of</strong>t and as we use it for<br />

documentation.<br />

5.8 Time requirement<br />

Figure 16: Documentation <strong>of</strong> the result<br />

<strong>The</strong> <strong>verification</strong> process with the <strong>2D</strong>-<strong>ARRAY</strong> <strong>seven29</strong> is highly standardized. <strong>The</strong>refore, the entire<br />

procedure can be performed within an acceptable time. In Tab. 1, the time requirements for the<br />

different <strong>verification</strong> steps for a five-field IMRT plan are collected.<br />

Future versions <strong>of</strong> VeriS<strong>of</strong>t will allow an even more automated data analysis, so that a further time<br />

reduction can be expected.<br />

Procedure Section Average time<br />

[min]<br />

Transfer <strong>of</strong> the patient treatment fields and dose calculation 5.3 10<br />

Export <strong>of</strong> the <strong>verification</strong> dose plane 5.4 5<br />

Verification measurements including setup 5.5 25<br />

Analysis <strong>of</strong> the measurements with VeriS<strong>of</strong>t 5.6 20<br />

Total 60<br />

Table 1: Time requirement for the different steps <strong>of</strong> the <strong>verification</strong> procedure.<br />

<strong>The</strong> time requirement listed above is for the <strong>verification</strong> process with the <strong>2D</strong>-<strong>ARRAY</strong> <strong>of</strong> one patient<br />

plan. However, if plans <strong>of</strong> more than one patient have to be verified, the same hardware setup for<br />

the measurements is used, resulting in time savings. <strong>The</strong> <strong>verification</strong> process itself is also more<br />

efficient if all fields <strong>of</strong> all patients are checked against the plans in one session.<br />