09.07.2015 Views

detailed - Chennai Telephones - BSNL

detailed - Chennai Telephones - BSNL

detailed - Chennai Telephones - BSNL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Name of work:-Attending to faults and overhauling of 125KVA Trolley mounted EA set(Kirloskar) @ Madhavaram TE Bldg, <strong>Chennai</strong>.20.2 However, the department may relax the above stipulation in exceptionalcircumstance where:a) The same is necessitated due to non-availability of material/component ofcertain specifications or make.ORb) Such alterations constitute an improvement in the opinion of the contractor.20.3 Prior written approval of the department shall be obtained before execution of suchalterations/modifications.21. Quality AssuranceThe EI works are to be executed in accordance to the CPWD specifications. The work isconsidered to be completed only after the successful completion of testing.ContractorExecutive Engineer (E)Electrical Division IContractor Internet Downloaded copy Executive Engineer (E)Page 9 of 38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!