10.07.2015 Views

Annexure A

Annexure A

Annexure A

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SCHEDULESSCHEDULE 'A'Schedule of Quantities :- Attached.SCHEDULE 'B'Schedule of materials to be issued to the contractor.Sl. No. Description of Item Quantity Rates in figures & words at Place of Issuewhich the material will becharged to the contractor1 2 3 4 5SCHEDULE 'C'Tools and Plants to be hired to the contractorAs per <strong>Annexure</strong>Sl. No. Description Hire charges per day Place of issueSCHEDULE 'D'1 2 3 4--------------------NIL---------------Extra schedule for specific requirements/documents for the work, if any.NilSCHEDULE 'E'Schedule of component of Cement, Steel, Other Materials, Labour etc. for Price escalation.CLAUSE 10 CC --- Not applicableComponent of Cement - Expressed as per cent of total value of work Xc --------------- %Component of Steel - Expressed as per cent of total value of work Xs --------------- %Component of civil (except cement & steel)/Electrical construction Materials -Expressed as per cent of total value of work. Xm ---------------- %Component of Labour - Expressed as per cent of total value of work Y ---------------- %Component of P.O.L. - Expressed as per cent of total value of work Z ---------------- %Not ApplicableSCHEDULE 'F'Reference to General conditions of contract :-General conditions of contract for CPWD works-2003 withamendments attached at page 17 to 30 and correction slips issuedupto the last date of issue of tender.Name of Work :- As per <strong>Annexure</strong>Estimate cost of Work :- Rs. As per <strong>Annexure</strong>(i) Earnest Money :- Rs. As per <strong>Annexure</strong>(ii) Performance Guarantee :- 5% of the tendered value of work.(iii) Security Deposit :- 5% of the tendered value of work.GENERAL RULES AND DIRECTIONS:Officer Inviting Tender Assistant Engineer (E) M-3521 / PWD EMD M-352Maximum percentage for quantity of items of work to be executedbeyond which rates are to be determined in accordance withClauses 12.2 & 12.3.See BelowDefinitions:2(v) Engineer-in-Charge Assistant Engineer (E) M-3521 / PWD EMD M-3522(viii) Accepting Authority Assistant Engineer (E) M-3521 / PWD EMD M-3522(x)Percentage on cost of materials andlabour to cover all overheads and profits. 15%2(xi) Standard Schedule of Rates DSR 1994/95 with Correction slips issued upto thelast date of issue of tenders.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!