10.07.2015 Views

Annexure A

Annexure A

Annexure A

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Clause 42i) (a) Schedule/statement for determining theoretical quantity N.Aof cement & bitumen on the basis of Delhi Schedule ofRates _____________ printed by CPWD.ii)Variations permissible on theoretical quantities:-a) Bitumen for all works. (i) Tack coat N.A(ii) DBM /DBC N.Ab) Steel reinforcement and structural steel sections N.Afor each diameter, section and category.c) CementRECOVERY RATES FOR QUANTITIES BEYOND PERMISSIBLE VARIATIONSl. No.Description of ItemRates in figures and words at which recovery shall be made from the contractor.Rate in schedule ‘B’ plus 10% in case material issued by Department.Excess use beyond permissible Less use beyondVariation the permissible variation1 2 3 4Material to be arranged by contractor :1. Emulsified Bitumen N.A.2. Bitumen of grade 60/70 N.A3. Modified Bitumen (CRMB-60) N.AAssistant Engineer (E) M-3521,PWD EMD M-352, FSL BuildingRohini, Delhi-110 085.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!