9) P/F water proof submersible cable joint etc. as reqd. 6 nos. each10) Lowering of upto 10 HP Submersible/Mono-submersible P/set inbore well/under ground tank with help of chain pulley block &tripot etc. as reqd. 5 nos. eachTotalRs.Terms & Conditions :-1) The work shall be carried out as per CPWD Specifications.2) No T &P shall be issued by the Deptt. to the contractor.3) The Material shall have to be got approved by the Engineer-in-Charge.4) Any damage done to the installation shall be specified by theagency.5) Dismantled material shall be returned back to the Deptt.6) Where makes are not specified, the material shall be of reputedmakes only.7) Guarantee shall stand for six months by the contractor for repairedarticles. AE(E) M-3521