10.07.2015 Views

Rajasthan Housing Board revised schedule of Powers delegated to ...

Rajasthan Housing Board revised schedule of Powers delegated to ...

Rajasthan Housing Board revised schedule of Powers delegated to ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Note:-11 No <strong>of</strong>ficer is competent <strong>to</strong> passany excess over a <strong>revised</strong> estimatesanctioned by an authority higher thanhimselfNote:-12 For subsequent revision <strong>of</strong>estimate also, the amount <strong>of</strong> estimatesshall form basis for revision .4. To accord administrative and technical 1.Works committee Rs.20.00 lacsapproval and <strong>to</strong> approve tenders 2.Chief Engineer Rs.5.00 lacsconducting <strong>of</strong> detailed survey and 3.Addl .Chief Engineer Rs.2.00 lacsinvestigation preparation <strong>of</strong> designsand drawings, project formulation andpreparation and other studies, appointingconsultant Architectural consultancyNote:-1 Certificate is recorded by Headetc.other than by departmental<strong>of</strong> Department that the departmentalAgency e.g. private consultancyorganisation existing for the work is eitherservices (Subject <strong>to</strong> specific approvalfully occupied or is not well equipped for<strong>of</strong> the <strong>Board</strong> and specific budgetprovision for carrying out studiesthrough private agency)the job.5. To accord technical sanction <strong>to</strong> repairs and 1.works Committee Full powersMaintenance estimates during construction 2.Chief Engineer Rs.3.00 lacsChargeable <strong>to</strong> project estimate within budget 3.Addl. Chief Engineer Rs.2.00 lacsallotment excluding maintenance and repairs 4.Dy.<strong>Housing</strong> Commissioner Rs.1.00 lac<strong>of</strong> <strong>to</strong>ols and plant. 5. Resident Engineer Rs.0.20 lacNote:-2. In case <strong>of</strong> work <strong>of</strong> preparation <strong>of</strong>designs and drawings, architecturalconsultancy and interior decoration ,landscaping <strong>of</strong> buildings etc.,the commentsand N.O.C. from senior Town planner <strong>of</strong>RHB shall be required.Note: -3. Tenders are invited as perprocedure laid down under Rule 306A <strong>of</strong>PWF & AR.Note: - 4. Retired persons will not beeligible for such assignments for two yearafter retirement, except with specific<strong>Board</strong> sanction.6. To accord technical sanction <strong>to</strong> detailed 1.Dy.<strong>Housing</strong> Commissioner Full powers up<strong>to</strong> the limit <strong>of</strong> the budgetestimates for ordinary repairs.allotment and subject <strong>to</strong> provision takenin final costing , which ever is less.7. To accord technical sanction <strong>to</strong> detailed 1. Dy.<strong>Housing</strong> Commissioner Full powers or up<strong>to</strong> budget allotment /estimates for especial repairs.provision taken in costing which ever isless.Note:-1. For each estimates exceptrepairs <strong>to</strong> residential buildings subject <strong>to</strong>paras 71-98 <strong>of</strong> chapter II <strong>of</strong> P.W.Dmanual4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!