10.07.2015 Views

Rajasthan Housing Board revised schedule of Powers delegated to ...

Rajasthan Housing Board revised schedule of Powers delegated to ...

Rajasthan Housing Board revised schedule of Powers delegated to ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Note:-4 Total amount i.e. tenderedamount plus cost <strong>of</strong> extra items does notexceed the monetary limits <strong>to</strong> sanctiontender mentioned at item No. 1528. To sanction execution, sanction <strong>of</strong> rates 1.Works Committee Full powersand payment <strong>of</strong> non-BSR extra and/oradditional items not provided for in a 2.Chief Engineer Full <strong>Powers</strong> up <strong>to</strong> 20% <strong>of</strong> Schedulesanctioned tender/estimate.amount <strong>of</strong> the work or Rs.20.00 lacwhichever is less.3.Additional Chief Engineer Full <strong>Powers</strong> up <strong>to</strong> 20% <strong>of</strong> Schedule. amount <strong>of</strong> the work or Rs.10.00 lacswhichever is less.4. Dy <strong>Housing</strong> Commissioner Full <strong>Powers</strong> up <strong>to</strong> 20% <strong>of</strong> Schedule. amount <strong>of</strong> the work or Rs.5.00 lacswhichever is less.5. Resident Engineer Full <strong>Powers</strong> up <strong>to</strong> 20% <strong>of</strong> Schedule. amount <strong>of</strong> the work or Rs.1.00 lacwhichever is less.Note: - 1 Revised estimates have beensubmitted <strong>to</strong> the competent authority ifthe items are not provided for in originalestimates.Note:-2 Scales <strong>of</strong> accommodation ornorms, types, designs sanctioned byG.A.D. / higher authority are notexceeded.Note:-3 Material deviations from designsand scope <strong>of</strong> the Project with requireapproval <strong>of</strong> the original sanctioningauthority.Note:-4 Total amount i.e. tenderedamount plus cost <strong>of</strong> extra items does notexceed the monetary limits <strong>to</strong> sanctiontender mentioned at item No. 1529. To allow shorter period than prescribed Chief Engineer /Addl. Up <strong>to</strong> 50% <strong>of</strong> original period prescribed inin rules for advertising tenders Chief Engineer rules only in urgent cases and forrecorded reasons. Prior approval shall beobtained for this purpose by tenderinviting <strong>of</strong>ficer.30. To advertise for tenders as per Resident Engineer Full powers subject <strong>to</strong> Rule 328.rules and sanction expenditure on suchadvertisement as per approved ratesNote:-1 The N.I.T. for several worksshould be clubbed in order <strong>to</strong> effecteconomy.Note:-2 N.I.T. has been invited only afterfulfilling conditions laid down in P.W.F.&A.R.14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!