10.07.2015 Views

INSTALLATION MANUAL - Jergens Inc.

INSTALLATION MANUAL - Jergens Inc.

INSTALLATION MANUAL - Jergens Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>INSTALLATION</strong> <strong>MANUAL</strong>ZPS- K 10.3, K20.3CLAMPING MODULEworkholding@jergensinc.com877.426.25040. IntroductionCAUTION:The original configuration of this system may not be modified under any conditions.Using this system for purposes other than those which the manufacturer intended candamage the system or harm the operator. Advance permission from the manufacturer mustbe obtained before machining materials other than those described in these instructions.Symbols usedMachining processes that represent a risk, or can cause injuries or harm to health if they are notproperly performed.Machining processes that may only be performed by qualified specialist personnel. Thepossibility of residual risks cannot be ruled out.0.1 Operating personnelAs already mentioned above, certain operations must be performed exclusively by qualified ortrained personnel. The following standard features are used to describe the qualification level:Qualified personnel have sufficient technical knowledge or work experience to be able torecognize and prevent possible dangers (engineers and technicians).Trained personnel are appropriately instructed and/or monitored by qualified persons to beable to recognize the dangers and prevent them (personnel assigned to operation ormaintenance). They must have the following qualifications:1. They must be trained and authorized to operate the product safely and supply it withoperating pressure or interrupt the supply, and to mark it in accordance with thestandard safety regulations.2. They must be trained in the correct procedure for maintenance and use of safetyequipment in accordance with the standard safety regulations.Before commissioning the equipment, the customer is obligated to make sure:1. Personnel has obtained, read and understood the installation manual;2. Personnel follow the instructions provided.0.2 Trained personnelMACHINE OPERATORS: Personnel who, based on appropriate instructions from the ownerof the Zero Point System (ZPS), are assigned and authorized to operate it and connecteddevices. In addition, a complete knowledge and unlimited understanding of the contents of thepresent handbook.0.3 Individual protective equipmentPersonnel must wear the appropriate protective clothing required for the use of the workingmachine on which the Zero Point System (ZPS) is installed.Safety shoes are required, whereas the necessity of wearing hearing protectors, safetyhelmets and safety goggles must be judged by the operating company.<strong>Jergens</strong> Workholding Solutions 877.426.2504 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!