11.07.2015 Views

flood plain information south creek, north creek, catfish - Sarasota ...

flood plain information south creek, north creek, catfish - Sarasota ...

flood plain information south creek, north creek, catfish - Sarasota ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Left Bank. The bank on the left side of a river, stream,or watercourse, looking downstream.Right Bank. The bank on the right side of a river,stream, or watercourse, looking downstream.Standard Project Flood. The <strong>flood</strong> that may be expectedfrom the most severe combination of meteorological and hydrologicalconditions that are considered reasonably characteristic of thegeographical area in which the drainage basin is located, excludingextremely rate combinations. Peak discharges for these <strong>flood</strong>s aregenerally about 40 - 60 percent of the Probable Maximum Floods forth8 same basins. As used by the Corps of Engineers, Standard ProjectFloods are intended as practicable expressions of the degreeof protection that should be sought in the design of <strong>flood</strong> controlworks, the fai lure of which might be disastrous.Underclearance Elevation. The elevation at the top ofthe opening of a culvert, or other structure through which watermay flow along a watercourse.32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!