MC-3: Steam Locomotive Inspection, Maintenance, and Operating ...
MC-3: Steam Locomotive Inspection, Maintenance, and Operating ...
MC-3: Steam Locomotive Inspection, Maintenance, and Operating ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
76. Piston travel.77. Foundation brake gear.78. Leakage.79. Train signal system.Cabs, Warning Signals, S<strong>and</strong>ers <strong>and</strong> Lights80. Cabs <strong>and</strong> cab amenities.81. Cab aprons.82. Fire doors.83. Cylinder cocks.84. Reset safety controls85. Audible warning device.86. Required illumination.87. Cab lights.Throttles <strong>and</strong> Reversing Gear88. Throttles.89. Reverse gear.Draw Gear <strong>and</strong> Draft Systems90. Draw gear between locomotive <strong>and</strong> tender.91. Chafing irons.92. Draw gear <strong>and</strong> draft systems.Driving Gear93. Pistons <strong>and</strong> piston rods.94. Crossheads.95. Guides.96. Main, side <strong>and</strong> valve motion rods.97. Crank pins.Running Gear98. Driving, trailing, <strong>and</strong> engine truck axles.99. Tender truck axles.100. Defects in tender truck axles <strong>and</strong> journals.101. <strong>Steam</strong> locomotive driving journal boxes.102. Tender plain bearing journal boxes.103. Tender roller bearing journal boxes.104. Driving box shoes <strong>and</strong> wedges.105. Lateral motion.Trucks, Frames <strong>and</strong> Equalizing System106. <strong>Steam</strong> locomotive frame.107. Tender frame <strong>and</strong> body.108. <strong>Steam</strong> locomotive leading <strong>and</strong> trailing trucks.109. Tender trucks.110. Pilots.111. Spring rigging.