Corrigendum to RFP - National Crime Records Bureau
Corrigendum to RFP - National Crime Records Bureau
Corrigendum to RFP - National Crime Records Bureau
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Crime</strong> & Criminals Tracking Network and Systems ProjectHaryana PoliceoLink Load Balancer should support below Management optionso Secure Web Based Managemen<strong>to</strong> SSHo TELNETo SNMP v1, 2, 3 Based GUIo Command Line7. Production CAS (State) Application Services related servers (Web, Portal, Application,Database, Direc<strong>to</strong>ry, etc…)Blade Chassis SpecificationSingle blade chassis should accommodate minimum 6 or higher hot pluggableblades.6U <strong>to</strong> 12U Rack-mountableDual network connectivity for each blade server for redundancy should beprovided. Backplane should be completely passive device. If it is active, dualbackplane should be provided for redundancyShould accommodate Intel, AMD, RISC / EPIC Processor based Blade Serversfor future applicationsShould have the capability for installing industry standard flavours of Windows,Linux, Unix, Solaris for x86 Operating EnvironmentsSingle console for all blades in the enclosure or KVM ModuleDVD ROM can be internal or external, which can be shared by all the bladesallowing remote installation of S/W and OSMinimum 1 USB portTwo hot-plug/hot-swap, redundant 1Gbps Ethernet module with minimum 8 ports(cumulative), having Layer 2/3 functionality.Two hot-plugs/hot-swap redundant 4 Gbps Fiber Channel for connectivity <strong>to</strong> theexternal Fiber channel Switch and ultimately <strong>to</strong> the s<strong>to</strong>rage device.Power SuppliesooHot plug/hot-swap redundant power supplies <strong>to</strong> be providedPower supplies should have N+N. All Power Supplies modules should bepopulated in the chassisHot pluggable/hot-swappable redundant Cooling UnitManagemen<strong>to</strong>oSystems Management and deployment <strong>to</strong>ols <strong>to</strong> aid in Blade Serverconfiguration and OS deployment,Remote management capabilities through internet browserGovernment of Haryana <strong>Corrigendum</strong> <strong>to</strong> <strong>RFP</strong> for Selection of System Integra<strong>to</strong>r Page 28 of 61