<strong>January</strong>-<strong>August</strong> <strong>2012</strong>The <strong>Punj</strong> <strong>Lloyd</strong> Magazine2 Bangalore Metro Reach 113 <strong>Punj</strong> <strong>Lloyd</strong> BuildsMotor Spirit QualityUpgradation Unit,Barauni, India28 Sembawang Engineers& Constructors adoptsMuhammadiyah WelfareHome in Singapore30 Sculptors of ModernInfrastructure36 Showcasing Competence42 Middle East projectsupdate<strong>Punj</strong> <strong>Lloyd</strong> BuildsMotor Spirit QualityUpgradation Unit,Barauni, India


Bangalore Metro Reach 1Update > <strong>January</strong>-<strong>August</strong> <strong>2012</strong> 2


With the rapid pace ofdevelopment globally, nationshave increased their focus oncreating infrastructure that canprovide integrated solutions tothe public at large. The needof the hour is to provide publictransport systems to ensureeasier, smoother and fastertravel. Mass transit systemsare meant to encourage thepublic to adopt affordabletransport solutions, save fueland decrease the pressure onexisting infrastructure.3Update > <strong>January</strong>-<strong>August</strong> <strong>2012</strong>


A AravindanGeneral Manager - Projects<strong>Punj</strong> <strong>Lloyd</strong> LtdM S BhattAdditional General Manager - Projects<strong>Punj</strong> <strong>Lloyd</strong> LtdAn OverviewAfter the success of the Delhi Metro,where <strong>Punj</strong> <strong>Lloyd</strong> was involved in theconstruction of an elevated viaductwith four stations on the Inderlok-Mundka corridor, and the stretchbetween Kirtinagar-Tilaknagar, theCompany is now proud to executemetro stations for Bangalore MetroRail Corporation Limited (BMRCL).A joint venture of Government ofIndia and Government of Karnataka,BMRC has been entrusted with theresponsibility of implementation ofthe Bangalore Metro Rail project.Bangalore is one of the mostdeveloped and progressive cities ofIndia. Rapid growth has resulted insevere traffic congestion and the cityis in dire need of a multi-modal transportsystem. The Bangalore MetroRail Project will contribute immenselyto realign the traffic situation of thismetropolitan city, ensuring seamlesstravel for the commuter.Adding to the beauty ofBangalore’s skyline, the BangaloreMetro, popularly called the NammaMetro, will significantly contribute tothe reduction of carbon emissions,adding to comfort while travelling.The Pride of Bangalore-Namma MetroTo the delight of the people ofBangalore, the first stretch ofthe Namma Metro, betweenBaiyappanahalli and M G Road, waslaunched in October 2011.Snaking its way through thebustling commercial and residentialareas of Bangalore, the sleekBangalore Metro, promises thecommuter rapid connectivity,convenience, affordability, frequency,reliability and safety. This is thefirst metro rail project in Indiacommissioned with 750V DC ThirdRail on Standard Gauge 1 .Namma Metro’s first 12-daycumulative revenue was Rs 1 crore(US$199,500) 2 .Phase I of Bangalore Metro,consisting of two corridors of doubleline electrified-The East-West corridorand the North-South corridor, willSection Line RouteReach-1 East Line Cricket Stadium to Baiyappanahalli (6.7 km)Reach-2 West Line Leprosy Hospital to Mysore Road (6.4 km)Reach-3 North Line Sampige Road to Yeshwanthpur (5.1 km)Reach-3A First North Extension Line Yeshwanthpur to Peenya Industry (4.8 km)Reach-3B Second North Extension Line Peenya Industry to Nagasandra (2.5 Km)Reach-4 South Line National College to Rashtreeya Vidyalaya Road (4.1 km)Reach-4A South Extension Line Rashtreeya Vidyalaya Road to Puttenahalli (3.9 km)UG 1 North-South Underground Line Between Sampige Road and National College (4.0 km)UG 2 East-West Underground Line Between Cricket stadium and Magadi Road (4.8 km)Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>Source: 1) http://bmrc.in/about_us.htm2) http://en.wikipedia.org/wiki/Namma_Metro4


Line Elevated Length (km) Underground Length (km) Total Length (km) StationsPurple Line 13.22 4.88 18.10 17Green Line 20.20 4 24.20 25Total 33.42 8.88 42.30 42cover a total of 42.30 km.Implementation of the elevatedparts of Phase I has been dividedinto 4 ‘reaches’ and 2 undergroundsections connecting Reach-1 andReach-2 in the East-West Corridorand Reach-3 and Reach-4 in theNorth-South Corridor respectively.The East-West corridor or thePurple Line is 18.10 km long, startingfrom Baiyappanahalli and terminatingat Mysore Road terminal, via SwamiVivekananda Road, Indiranagar,Halasuru, Trinity, Mahatma GandhiRoad, Cubbon Park, VidhanaSoudha, Sir M Visveshwaraya,Kempegowda, City Railway Station,Magadi Road, Hosahalli, Vijayanagar,Attiguppe and Deepanjali Nagar.The North-South corridor or theGreen Line is 24.20 km long, and willstart at Nagasandra and terminate atPuttenahalli, via Dasarahalli, Jalahalli,Peenya, Yeshwanthpur, Sandal SoapFactory, Mahalakshmi, Rajajinagar,Kuvempu Road, Srirampura,Sampige Road, Kempegowda,Chickpete, Krishna Rajendra Market,National College, Lalbagh, SouthEnd Circle, Jayanagar, RashtreeyaVidyalaya Road, Banashankari, andJaya Prakash Nagar stations.The metro will be acomplementary mode of transport,running in tandem with othertransport systems of buses and themono rail. Feeder bus services willbe provided to all the metro stations.Bus bays and parking facilities forprivate vehicles will be available atall major stations. Moreover, theBangalore Metro will be integratedwith the railways and other modes oftransport at Baiyappanahalli railwaystation in the East, Yeshwantpurrailway station in the North,Bangalore city railway station andKempegowda bus stand in citycentre.<strong>Punj</strong> <strong>Lloyd</strong>’sScope of WorkBMRC awarded <strong>Punj</strong> <strong>Lloyd</strong> eightMetro Stations across threeReaches:Reach 1• M G Road Station• Trinity Circle StationReach 2• Magadi Road Station• Deepanjali Nagar Station• Mysore Road Terminal StationReach 3• Rajajinagar Station• Malleshwaram Station• Kuvempu StationThe work involved constructionof these eight metro stations startingfrom the pile foundation, piers,girders, station buildings includingall architectural, fire protection toinstalling of electronic systems.Adding to the beautyof Bangalore’s skyline,the Bangalore Metro,also popularly calledthe Namma Metro,will significantlycontribute to thereduction of carbonemissions, addingto comfort whiletravelling.5 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


This is the first MetroRail project in Indiacommissioned with750V DC Third Rail onStandard Gauge


Building infrastructurein the busiest partof a city is nevereasy. <strong>Punj</strong> <strong>Lloyd</strong> wasconscious of thisfact, adopting bestpractices of HSEQthroughout projectexecution.Both the stations in Reach 1 havealready been completed and areoperational.Gliding smoothlyAs you walk into the metro station,the vibrant green and purple housecolours of the Namma Metro, grabyour attention. What also strikesone is the smooth and sleek finishof the entire station, from the graniteflooring, the escalator or the ticketcounter. A truly unique projectfor <strong>Punj</strong> <strong>Lloyd</strong> as other than thestructural work, this project alsoincluded the finishing and MEP(Mechanical, Electrical and Plumbing)work which matches internationalstandards.Being an MRT infrastructureproject, every aspect of theproject was planned to add to theexperience of the traveler. Variouscolours of marble and granite wereused, exceeding 13,000 sqm of areawhile brick and block masonry wasacross 1,100 sqm. Over 30,000sqm of wall was painted, while falseceiling installed was nearly 3,650sqm at all the levels. Aluminumcomposite panel work, along withthe structural glazing work, coveringall the external surfaces wasapproximately 9,300 sqm. All publichealth and environment systems, aswell as the fire protection and safetysystems were installed by <strong>Punj</strong> <strong>Lloyd</strong>.Structural WorkA total of 3,000 MT of structural steelhad to be fabricated and erectedat the stations in the form of archtrusses, purlins, staircases, foot overbridge etc. Structural work amountedto 73,972 m 3 of concrete, TMTrequirement being 15,300 MT.A total of 978 piles had to bebored, varying in diameter from600 mm to 1,600 mm. 1,377 precastgirders were cast at a yard, locatedon the outskirts of the city. They weretransported from the yard via trailersand erected at site; the highesterection being at a height of 25 mfrom the ground level. The longestgirder measured 19 m and theheaviest, 50 MT.Unique TechnologiesFor the casting of pre-tensioned andpost-tensioned girders, prestressingtechnology was used. Out of the1,377 girders, 997 were prestressedconcrete (PSC) girders. One ofthe distinguishing features of theBangalore Metro Project was theuse of steam curing, wherein steamis continuously supplied and atemperature of 70º C maintained,resulting in concrete attaining 85 percent strength in a single day. Withthe use of this unique technology,Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>8


the rate of production of the girderswas increased and the cycle timeof a normal pre-tensioned girderwas reduced to two and a half daysinstead of a nine day casting cycle.This ensured rapid progress ofprecast girder production.WATER TANKSTEAM CURINGSTARTDIESEL TANKERCentral Precast YardThe Central Precast Yard, situated20 km from the city, was a greatasset and served a multipurposerole. Not only was it used for castingstructures, but the procurement,inventory and plant & equipmentteams, operated out of there.Fabrication work for the project wasalso done at the central precastyard as well as storage of surplusstaging and shuttering material.The labour camp, housing over 200workmen, within the precast yard,sprawled across 1,600 sqm. Theworkers’ camp was well maintainedand inspections were undertakenregularly to ensure that a clean andhealthy environment was provided tothe workers.Adopting Best PracticesBuilding infrastructure in the busiestpart of a city is never easy. <strong>Punj</strong> <strong>Lloyd</strong>was conscious of this fact, adoptingbest practices of HSEQ – health,safety, environment and quality,throughout project execution.SAFETYFastening the safety beltSafety of workmen is extremelyimportant to us at all our constructionsites. However greater vigilance isWATER SOFTENER (FOR SOFTENINGOF HARD WATER FROM BORE WELL)required in sites like that of the Metrobecause it involves the safety of thepublic, due to its location.All workers were mandated towear Personal Protective Equipment(PPE). Workmen operating at heightswere given special and repeatedtraining. Weekly Tool Box meetingswere held. Personnel were notpermitted to enter the premises0CBOILERATTAINS THE CONSTANTPRESSURE OF 10 kg/cm 2STEAM RELEASED FOR CURINGGIRDERSGRADUALLY INCREASINGTHE TEMPERATURE TO 70°CATTAININGTHE TEMPERATURE OF 70°CMAINTAIN CONSTANT TEMPERATUREOF 70°C FOR 10 HOURSDECREASING THE TEMPERATURETO ROOM TEMPERATURESTOPCASTING YARDCOVERING THE GIRDERSWITH TARPAULINE9 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


It was with greatpride that <strong>Punj</strong> <strong>Lloyd</strong>received the SafetyAward for 3 millionmanhours withoutloss time accidentfor the BangaloreMetro Reach 3.without undergoing the safetyinduction programme, briefing themabout potential hazards at site andtheir management. To ensure thatsafety was not compromised, thesenior management monitored theprogrammes, increasing focus onsafe working. As many as 727 HSEtrainings and 9,454 tool box talkswere conducted at site, amounting to22,577 safety training man-hours.Mock drills at site checked thereadiness of the team. The projectclocked 11,019,868 safe manhourstill December 2011, drivingover 2.6 million safe kilometers.Regular inspections by the ResidentConstruction Manager and ProjectManagers were undertaken to keepa vigilant eye. Till date, approximately250 such inspections have beencarried out.Apart from all these activities,Safety Week is celebrated withgreat fervor every year. Workersare encouraged to ensure not justtheir own safety but that of theircolleagues. Prizes are given toindividuals, appreciating their focuson safe practices.It was with great pride that <strong>Punj</strong><strong>Lloyd</strong> received the Safety Award for3 million manhours without loss timeaccident for the Bangalore MetroReach 3.Public SafetyTo ensure safety on the road, varioussignboards were installed. Asconstruction was happening in themidst of the city, it was important toUpdate > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>10


differentiate the work site from thenormal public space. Barricadingwas done to prevent unauthorisedpersonnel from entering the area ofwork.Healthy livingWhile safety at the work site isimportant, general health and wellbeing of the staff is equally important.On the 1st of December every year,<strong>Punj</strong> <strong>Lloyd</strong> observes World AIDSDay where the employees at all sitesworldwide take various initiatives toraise awareness about AIDS and itspreventive measures.EnvironmentWhile human life is precious, <strong>Punj</strong><strong>Lloyd</strong> is equally conscious ofprotecting the flora and fauna. Inrapidly growing cities, infrastructuredevelopment is always perceived tobe at the cost of the environment.In constructing iconic landmarksglobally, <strong>Punj</strong> <strong>Lloyd</strong> has alwaysdisplayed environment sensitivity,minimising its impact on theenvironment or offsetting theimpact of its construction activitywith well planned environmentinitiatives. The Bangalore Metro sitewas no exception. Various initiativesincluding those for greening wereundertaken. Tree plantation wasdone in the precast yard whichplayed a central role in the siteoperations.Foot Over Bridge at MGRoad StationMahatma Gandhi Road (M GRoad) is one of the busiest roads inBangalore. The foot over bridge wasintended to join the Metro Station tothe Plaza building across the road.In order to erect the bridge, theroad had to be blocked for 48 hours.This put the project team underintense pressure. They were awarethat it was impossible to block theroad in the heart of the city beyond11 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


48 hours, given its importanceand location. Accepting thechallenge, the team set to work,erecting the entire structure in36 hours, 12 hours before thescheduled time. The two maingirders weighed approximately140 MT. Two 250 MThydraulic cranes were usedfor erection, while a 40 MTand 25 MT crane, were usedto hold the structures.Project StatusReach-1 Stations: M G Road Stationand Trinity Circle were the first tohave been completed among allcontractors and have been handedover to the Client. The Reach-1 linewas inaugurated in October 2011.The rest of the six stations are beingcompleted. The Plaza BuildingBlock B of M G Road Station is alsobeing constructed by <strong>Punj</strong> <strong>Lloyd</strong>.•Achievements• <strong>Punj</strong> <strong>Lloyd</strong> was the First Contractor to hand over the metro stations in Reach 1.• The inauguration of the Reach 1 of the Bangalore Metro was a very proud moment for the project teamwhich had been relentlessly working to deliver state-of-the art infrastructure to the city.• Small achievements made way for this large victory !• Casting the maximum number of girders - 126 in a month over any other contractor.• Reducing girder casting time by use of unique technology. To produce 6 girders, the girder cycle timewas 58 hours, using this technology.• The largest and the deepest pile cast by any contractor was that of <strong>Punj</strong> <strong>Lloyd</strong> - 1,600 mm dia, 42 mdeep.• The Foot Over Bridge at M G Road Station, weighing over 150 MT, was erected in a mere 36 hours• The largest volume of concrete work was at Trinity Circle - 672 m 3 in 48 hours for the raft of thebasement including underground water tank.• Over 1,500 MT of structural steel in-house fabrication has been erected for the permanent structures.Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>12


<strong>Punj</strong> <strong>Lloyd</strong> BuildsMotor Spirit QualityUpgradation Unit,Barauni, IndiaThis is the secondMSQ project deliveredby <strong>Punj</strong> <strong>Lloyd</strong> forIndian Oil, the firstbeing the EPC projectat Haldia Refinery.13Update > <strong>January</strong>-<strong>August</strong> <strong>2012</strong>


The plant layout built in enhanced safety as per Oil Industry SafetyDirectorate (OISD) guidelines, at the design stage itself. This includedthe formulation of a disaster management plan and accident analysis.R PrasadResident Construction Manager, Barauni ProjectAjay SoniDeputy Manager - Projects<strong>Punj</strong> <strong>Lloyd</strong> LimitedIn a landmark move last year,India switched to eco-friendlyBharat Stage BS III and BS IV,equivalent to Euro III andEuro-IV petrol and diesel. Theultra-low sulphur and benzeneBS III and BS IV petrol and dieselnot only reduce exhaust emissionfrom vehicles but also improvethe power and efficiency of theengines.As one of India’s leading EPCcompanies, <strong>Punj</strong> <strong>Lloyd</strong> played its partin building infrastructure that couldhelp attain the above objective. TheMotor Spirit Quality Upgradation Unitat Indian Oil’s Barauni Refinery wasdesigned to produce gasoline withBharat Stage III specifications. Thisis the second MSQ project deliveredby <strong>Punj</strong> <strong>Lloyd</strong> for Indian Oil, the firstbeing the EPC project at HaldiaRefinery.The MSQ unit at Barauni is basedon Axens technology on a LumpSum Turnkey basis, producing aMS pool based on Axens NHDT,Isomerisation, Prime G+ and NSU/HDT/CRU processes. A total of fiveproduct streams are sent to theMS pool, out of which two are wildand three controlled streams. Wildstreams comprised Light CrackedNaphtha and Heart Cut Naphthacoming from Prime G+ unit, whereascontrolled stream comprisedIsomerate coming from ISOM unit,Reformate coming from RSU andDesulphurised Heart Cut Naphthacoming from Prime-G+.The project also comprisedconstructing a Nitrogen Plant, H2bullet, control room, substation,air compressor, five In Side BatteryLimit (ISBL) tanks, and four Out SideBattery Limit (OSBL) tanks, besidesfour prominent units which were:• NHDT unit• C5-C6 Isomerisation Unit• Reformate Splitter Unit• Prime-G+ UnitEngineeringCutting edge engineering wasdelivered by <strong>Punj</strong> <strong>Lloyd</strong> Group’sengineering arm, PL Engineering.The plant layout built in enhancedsafety as per Oil Industry SafetyDirectorate (OISD) guidelines, at thedesign stage itself. This includedthe formulation of a disastermanagement plan and accidentanalysis. All aspects of hazardprevention including locations ofgas detectors, fire extinguishers etc.were built in during the engineeringstage. The placement of equipmentas per the flow diagram and distancebetween equipment maintained asUpdate > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>14


PARAMETER Pre BIS 2000 BIS-2000 BS-II BS-III EURO-IVSulphur, wppm 2000 (leaded) 1000/500 500 150 50Benzene, Vol per cent 5.0 5/3 3.0 1.0 1.0Aromatics, Vol per cent - - - 42.0 35.0Olefins, Vol per cent (Regular/Premium)- - - 21/18 21/18RON, (Regular/premium) 87 88/93 88/93 91/95 91/95per OISD ensured least piping andrework.The TechnologyThe Motor Spirit produced by Axenstechnology will have 50 wppmsulphur, aromatic 35 vol per cent andhigh octane number, indicative of ahigh performance fuel.MS Quality UnitProcess UnitsReformer Splitter Unit 274Naphtha Hydro-TreatingUnit for ISOMCapacity(TMTPA)183ServiceRecover Light StraightEnds from Reformate forIsomerisationRemove Sulphur fromNaptha for IsomerisationReformate SplitterThe purpose of this unit is toremove benzene by fractionatingfull reformate into two cuts throughreformate splitter:• a light reformate with highbenzene content for theIsomerisation unit (Unit 802)• a heavy reformate with lowbenzene content to gasoline pool(containing less than 1.0 vol ppmbenzene).Isomerisation Unit (ISOM) 126 Isomerise Light EndsPrime G+Selective Hydro-treatingUnit (SHU) + LCN SplitterHydro-DesulphurisationUnit (HDS)Utilities/ Auto BlendingHeavy De-sulphurisedFCC GasolineHeavy Reformate322224Remove Sulphur fromLight FCC GasolineRemove Sulphur fromHeavy FCC GasolineSteam, Condensate,Nitrogen, Auto Blendingfrom Prime G+ HeavyEnds DesulphurisationSectionfrom RSUNaphtha Hydrotreating-NHDTNaphtha Hydrotreating producesclean desulphurised naphtha cutsuitable to be processed in theNHDT splitter after removal of allimpurities which are currently poisonsfor the catalysts (sulphur, nitrogen,water, halogens, diolefins, olefins,arsenic, mercury and other metals).IsomerateLight Cycle Naptha (FCCGasoline)from IsomerisationSectionBuffer storage forPrime G+ SelectiveHydrogenation Sectionfeed15 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


There were several accomplishments of the teamthat were noteworthy. <strong>Punj</strong> <strong>Lloyd</strong> stayed aheadin every aspect. For instance, to safeguard thecatalyst in the Isomerisation process, the acidisingprocess to remove moisture from the system wascompleted in 14 days instead of a normal 19.


BLOCK FLOW DIAGRAM - MSQ PROJECTDHDT NHS (SRN)LS (SRN)COKERNAPHTHA902752504026525190142127 14816346430162HDTHDT95520300102120 40 40ISOMRON 872422552111REF.RON 9624998115GT115HGU142PetroPurge242GASOLINEPoolBharat IIILCN322SHU806218RON 92700143 224 224HDSHCN23981158DHDT Pool158• The unit design capacity is183,000 MTPA (Metric Tons perAnnum), based on an on-streamfactor of 8,000 h/year.• The product contains less than0.5 wt. ppm sulphur and 0.5 wt.ppm nitrogen.IsomerisationIsomerisation is the conversionCOKER NAPHTHA SRNHEART CUT FROM SHUHY. LCN FROM 803CRU LIGHT REFORMATELIGHTNAPHTHAISOM87°C1.4 kg/cm g50 kg/cm 57.5 kg/cm g2g2 GAS160°C260°CR-01R-02STRIPPEDFEEDSECTION81°C13.5 kg/cm 2gC-02 C-01H 2P=2.5T=7167°C302°CH 2P=5.0T=42SEPARATORRGCHEAVYNAPHTHATO POOLSPLITTERV06STRIPPERSULPHUR GUARDUpdate > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>18


19 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


MP STEAMCHLORIDINGAGENTOFF GAS FUEL GASWATERHYDROGENLIGTH NAPHTHADRYERSR-1R-2 R-3 STABDRYERSMP STEAMCAUSTICSCRUBBERLIGHTISOMERATEDIHof low octane straight chaincompounds to their higher octanebranched isomers. The light hydrotreatednaphtha and light reformatefeed is dried and passed over anactivated chloride platinum basedcatalyst in the presence of oncethrough hydrogen, also dried. TheIsomerisation reactor temperaturesare kept low in the range of 120-170°C, taking advantage of thehigher equilibrium concentrationof isomers at lower temperaturesand minimising hydrocracking. Thereaction requires a very low partialpressure of hydrogen, enabling oncethrough hydrogen to be used. Priorto Isomerisation reactions, a fixedbed reactor for catalytic saturation ofbenzene in the presence of hydrogenis provided.A de-isohexaniser tower isincluded in the flow scheme in orderto recycle the low octane C6 n-paraffins and methyl pentanes backto the reactor circuit to obtain a highoctane product.Prime G+(803)This unit reduces sulphur content ofthe Low Cut Naphtha gasoline aswell as part of the Heart Cut Naphthagasoline, coming from the RefineryFluid Catalytic cracking in order tomeet the applicable motor spirit fuelspecification, while minimising octanelosses.The basic design utilisesAxens’ Prime G+ process, whichis a catalytic process for hydrodesulphurisationof gasoline.The design capacity of the unitis 322,000 MTPA for the SelectiveFCC GASOLINE*LCNHCNSHUSELECTIVEHYDROGENATIONHYDROGENMAKE-UPS P L I T T E RSWEET PURGELCNHEART CUTRECYCLEGASHDSHYDRODESULPHURIZATION* From debutainzer* From CRU or HGU (from H2 make-up compressors of isomerisation unit)** From HGU or from H2 rich gas chloride absorbersAMINE SECTIONHEAVYISOMERATEHydrogenation Unit and 81,000MTPA for the HDS section/Stabiliser.Huge quantum of workAs this was an operating refinery,commencing the piling work onundulated marshy land was quite achallenge. The construction teamhowever overcame all hurdles andsuccessfully completed 1635 pilesof 500 mm dia involving 6,500 cumconcreting. An overall concretingSOUR PURGES T A B I L I Z E RHCNPRODUCTSUpdate > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>20


5,900 MT structural steel with 40,000 sqmfire-proofing supported the entire pipingand equipment.of 26,500 cum including one blastproofcontrol room building of900 sqm floor area and one doublestoried sub-station building of2,700 sqm floor area was completedwithin a stringent time schedule.Construction of four storagetanks and five motor spirit blendingtanks was also within the projectscope of work. 18,000 sqm ofconcrete paved plant was accessedfrom all four sides by 9,000 sqmbituminous road.Fabrication and Erection5,900 MT structural steel with40,000 sqm fire-proofing supportedthe entire piping and equipment. Theproject required the installation andcommissioning of over 312 differenttypes of equipment including 162static, 118 rotary and 32 in package.A 60 m high Deisohexanercolumn, weighing 106 MT had tobe transported to the site. As it wasdifficult to transport it in one piece,the column was split into two andthen welded vertically in situ followedby hydrotesting which required skilledworkmanship.In a short span of 20 months, ahuge quantum of piping work had tobe completed. A network of pipingwas laid beneath the plant areaincluding hook up of cooling and firewater with the existing refinery.Working in offsite areas of arunning refinery was extremelychallenging and risky, but thediligence and expertise of the <strong>Punj</strong><strong>Lloyd</strong> team ensured safety at work.An overall 120 km of pipe was laidthroughout the entire refinery. Afterrelentless hard work, successfulcommissioning was achieved inDecember 2010.Advanced FeaturesInstrumentation and control for theMSQ project, Barauni assumedhigh importance as an advancedtechnology called the ‘FoundationField’ (FF) bus was used the firsttime in the history of Indian OilCorporation. Rarely used in refineries,the project team deployed thefoundation field bus technology alongwith smart instrumentation, whereinmajor critical loops were kept on FFand all non critical loops on smartinstrumentation control.A total of 57 marshalling cabinetswere installed in the control roomto cover the complete field control,along with six operator consoles, fourengineering stations and one largevideo display unit. As many as 5,424field instruments were installed totransmit the complete plant processdata to DCS and ESD for operationalcontrol. The field instruments wereconnected to the control room withvarious types of cables. Beside this,the plant was monitored througheight CCTV cameras in the field.Auto Bus Transfer scheme was21 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


With the adoptionof advanced safetyfeatures, the teamclocked over14,700,000 man-hourswithout any lost timeincident.


Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>24


implemented through numericalrelays and not the conventional typehardware. In order to prevent lossof power in any bus, PMCC andMCC were equipped with numericalrelays and multifunction meters forcombined metering parameters.These were connected to substationSCADA to monitor all metering andprotection features of any breakerfeeder.AchievementsInstallation in a live refinery is alwaysfull of challenges. However, with richexpertise in process plants, <strong>Punj</strong><strong>Lloyd</strong> commissioned the plant onemonth after mechanical completion.<strong>Punj</strong> <strong>Lloyd</strong> proactively adoptedOISD guidelines in the design stageitself. It complied with the HAZOPstudy (Hazard and OperabilityStudy), a structured and systematicexamination of a process in order toidentify and evaluate problems thatmay represent risks to personnelor equipment, or prevent efficientoperation.There were severalaccomplishments of the team thatwere noteworthy. <strong>Punj</strong> <strong>Lloyd</strong> stayedahead in every aspect. For instance,to safeguard the catalyst in theIsomerisation process, the acidisingprocess to remove moisture from thesystem was completed in 14 daysinstead of a normal 19.The offsite was outside thebattery limit hence enhanced safetywas required. The entire areawas covered using tin. What wasremarkable was that the entire unithas to be barricaded as while thePrime G+ was under construction,the NDHT was under commissioningand the hydrocarbon was alreadyflowing. This required extremelyhigh levels of safety. The entireConstruction offour storage tanksand five motor spiritblending tankswas also within theproject scope ofwork. 18,000 sqmof concrete pavedplant was accessedfrom all four sidesby 9,000 sqmbituminous road.25 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


Installation in a live refineryis always full of challenges.However, with rich expertisein process plants, <strong>Punj</strong> <strong>Lloyd</strong>commissioned the plantone month after mechanicalcompletion.Update > <strong>January</strong>-<strong>August</strong> <strong>2012</strong> 26


underground system has to beblinded from the Prime G+ sideas the underground network iscommon for all the plants.Procurement was a bigchallenge for this fast trackproject, which was under thedirect monitoring of the SupremeCourt of India. The value ofprocured material was highcomprising 271 mechanicalequipment, 1,845 electrical,5,424 instruments, 300 kmcables and 120 km pipes. Inthis project, <strong>Punj</strong> <strong>Lloyd</strong> wasawarded the complete electrical& instrumentation work on aturnkey basis in order toexpedite delivery.Crisis management, includingplanning for fire& gas hazards,was extensive.The fire and safety systemwas connected to the existingfire and safety control room ofthe refinery. After hazardousarea classification, a completefire fighting equipment layoutdetailing fire extinguishersand gas detectors at strategiclocations near each of theunits was made. Enhancedfeatures of safety were built inat the engineering stage. Frommarkings of fire tender entry,anticipating water demand &water velocity to the fire waterring around the plant and thewater supply from independenttie-in points of existing fire watersystem were all worked upon.Fire hydrants were positioned ata distance of 30 m around highhazard area. Enhanced vigilancewas maintained with monitorsat strategic locations. A strongpublic address system wasavailable along with manual callpoints.Further safety was ensuredin every possible way with OWSsystems being provided withvent pipes and the vent pipesbeing placed higher than nearbystructures, separate earthingof electrical and instrumentequipment, air fin coolers andhydro carbon pumps providedwith sprinklers, hooters insidethe compressors area, amongothers.With the adoption of suchadvanced safety features, theteam clocked over 14,700,000man-hours without any lost timeincident. •27Update > <strong>January</strong>-<strong>August</strong> <strong>2012</strong>


Sembawang Engineers and Constructorsadopts Muhammadiyah Welfare Home,in SingaporeA Corporate Philanthropy ProgramThe Home is also a charitableapproved institution of a publiccharacter registered under theCharities Act Cap 37. Establishedon December 27, 1989, currently,there are 70 residents housed at thehome, a mix of juvenile delinquentcases, those classified as BeyondParental Control, and those undercompassionate grounds. The Homealso cares for children who havehad a history of abuse and neglect.Residents are usually referred bythe Juvenile Court, Ministry ofKhoo Kim SengPublic Relations Manager (MRT DTL C919)Sembawang Engineers and ConstructorsNikki LeePublic Relations Officer (MRT DTL C919)Sembawang Engineers and ConstructorsAs part of its outreach effort,Sembawang Engineersand Constructors Pte Ltd(Sembawang), one of the leadingengineering, procurement andconstruction companies ofSouth East Asia, has adopted theMuhammadiyan Welfare Home,a children’s home appointedby the Ministry of CommunityDevelopment, Youth and Sports(MCYS) and gazetted under theChildren and Young Persons ActCap 38.Community Development, Youth &Sports or other organisations. Theresidents undergo 2 to 3 years ofrehabilitation programme.Sembawang has revamped thehome’s facilities by creating a newlearning hub. These include fourfully fitted classrooms with brandnew equipment, educational readingmaterial and sundries. Sharing theaspiration of ‘Knowledge is Power’,both Sembawang and the MuhammadiyahWelfare Home hope that theLearning Hub@MWH would be fullyutilised by the boys to study, exceland secure a better future, to breakaway from their challenged circumstancesand move on to becomea contributing member of society.Through the creation of this hub,Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>28


oth Sembawang and the Homehope to highlight the importanceof knowledge, regardless of age,circumstances and limitations.Commenting on the adoption,Richard Grosvenor, President andCEO, Sembawang, said, “Life is astruggle and therefore an endurancetest-nobody should start off feelingless than anybody else. A companyis what a company does. We Createand We Care".Apart from the classrooms,Sembawang, together with personalcontributions from its SeniorManagement, also sponsored onerefitted restroom to enhance thequality of amenities for the boys, newbed sheets and bath towels,300 chairs for Home’s events,two projectors and six laptops,yearly subscriptions of The StraitsTimes and Berita Harian newspapers,and the National GeographicKids magazine. Together, thissponsorship amounted to morethan S$ 113,000. •29 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


Sculptors of Modern InfrastructureChiam Soon KiamSenior Manager - Corporate CommunicationSembawang Engineers and ConstructorsIn a way, construction is akin to art! Sculpturing masterpieces, fromconcept to design to final finish! Carved in time, these designs livethrough centuries, reflective of their histories.Sembawang, in its journey as one of the largest EPC companies in AsiaPacific, has shaped many such iconic landmarks. Beckoning people fromall over the world, its headquarters in Singapore itself is the proud host ofstriking infrastructure. With extensive work in Mass and Light Rapid Transportand urban infrastructure, Sembawang has contributed greatly to Singaporebeing one of the most efficient countries of the world.Capturing the essence of this creation, President & CEO, Ric Grosvenor, ina philosophical moment wrote :“WE CREATE”Down through the ages the baton gets passedThis sacred fire to build everlastThe desire to triumph the will to succeedBoth in men and in women who carry this seedFor no one can explain it this creating of dreamsIt lives like an eagle so sacred it seemsSo we struggle through mud as we twist and we toilThe sinews of greatness in the arms of turmoilFrom the soul of an artist this sand it is castWill it outlive its maker-will it outlive its classNo matter the question it vexes them notFor these creators of dreams give all that they’ve got.R F GrosvenorUpdate > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>30


In this context, we introduce alandmark Sembawang project thatcreated an infrastructure that hadgreatly enhanced connectivity in thecountry.The Circle Line, which is a MassRapid Transit line in Singapore, isa significant part of Singapore’sgrowing rail system. The 33.3 km lineand 28 stations fully-undergroundorbital route links all the radial linesleading to the city thereby providingessential connectivity. Since all theMRT routes cross through someof the busiest areas in Singapore,all of its stations are locatedunderground, freeing up land forother developments.Sembawang built the final stageof the Circle Line, known as Stage5 Contract C856. The projectcomprised the construction andcompletion of four MRT stations(Pasir Panjang, Telok Blangah, HawPar Villa and Labrador Park, the lattertwo being civil-defence stations),HarbourFront Station fit-out works,3.7 km of twin bored tunnels, sixcross passages and three overheadbridges.The 5.8 m diameter twin boredtunnels were constructed by tunnelboring machine. Other worksincluded 640 m of cut-and-covertunnels, civil works, and architecturaland building services for the fourstations. The stations and tunnelsare largely located below busy publicroads and within a built-up corridor.A major challenge in itself, theWith extensivework in Massand Light RapidTransport andurban infrastructure,Sembawang hascontributed greatlyto Singapore beingone of the mostefficient countriesof the world.31 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


Sembawang took considerable measuresto minimise environmental impact to theresidents, businesses and the public duringthe construction stage.tunnel had to be excavated throughvariable ground conditions, undershop-houses, close to buildings,pipelines, power cables and gaslines, and finally link to otherunderground stations.Engineering ChallengesThe project was locatedunderground, in a complexgeological strata profile with highlyvariableground conditions thatinvolved excavating highly alternatingsedimentary and alluvial deposits.The ground conditions weremainly sedimentary rock, with highlyvaried weathering conditions. Whiletunnelling hard-rock material, theboring machine often bored intoalluvial soft clay and fluvial sands atclose intervals. As such, the projectteam encountered many mixed-faceconditions when tunnelling and hadto change methodologies frequentlyfor those different situations.The other major challenge wasground-water levels. Tunnellingactivity has the potential to partiallydrain water-laden clay and causedunwanted ground movement andsettlement. Sembawang used threepressure-balanced 6.6 m diameterHerrenknecht earth-pressure-balancetunnel boring machines equippedwith rock cutterheads dressed with41 17-inch cutterdisks to ensureadequate allowance and minimisedisruption when tunnelling. Thewater table was also monitoredclosely and intensively to ensure itwas within tolerable limits.Another major challenge wasthat all the underground siteswere situated below public roadsand existing buildings. In addition,viaducts, utilities, drains and canalswere located within the vicinitiesof the underground sites. Due tosite constraints, Sembawang hadto navigate its way below a rangeof structures, from public roads toresidential housing and commercialblocks. The tunnel alignment ranalong the path of an elevated 3-lanedual carriageway, the West CoastHighway, at one section, passingvery close and between its piledfoundations with less than 2 mclearance from the tunnel boringmachine’s outer curvature to thebored piles of the viaduct pier.Coupled with challengingground conditions and a need forlane-for-lane replacement whendiverting traffic in the affectedareas, the construction works hadto be frequently re-scheduled orre-sequenced. Equipment planningand execution of the works had tobe carried out with care and detail.State-of-the-art monitoring systemswere supplemented with traditionalinstrumentation to keep track ofprogress to ensure the safety ofstructures above and the public ingeneral.Environmental ImpactSembawang took considerablemeasures to minimize environmentalimpact to residents, businesses andthe public during the constructionstage. Careful planning was doneto minimise noise and dust pollutionlevels, which were monitored andUpdate > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>32


kept within limits, when practicable.Equipment designed to keep noiseand vibration to a minimum was usedalong with rescheduling works atappropriate times.Temporary works were alsoconstructed in sequence with theprogress of permanent works tominimise impact on the environment.Public RelationsConstruction activities inevitablyaffect large and varied communities.The complexity of the project alsoaccentuated the importance ofregular community engagementswith the wide range of stakeholdersalong the project vicinity.Sembawang established goodrapport and actively engaged localcommunities and interest groupsto seek their understanding andsupport. To keep in touch withstakeholders, Sembawang organisedprogrammes such as CommunityTalks, Stakeholders’ Site Visits andStakeholders’ Engagement to allowthem to understand our work better.Our public-relation officers weremeticulous in ensuring that ourproject moved with a minimum ofdisturbance to the community. Theydealt with feedback and complaintsfrom the public; planned andcarried out dialogues with propertyowners, residents, ManagementCorporations, Residents Committeesand Citizens ConsultativeCommittees. Newsletters and othermaterial were printed to updateand inform them of the progressof our work and happenings. Ourofficers were also active in mitigatinginconvenience and disputes for thecommunity.33 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


FinaleThe Circle Line was built in variousstages. The first stage was openedfor service on 28 May 2009.Sembawang’s section, being the finalstage of the Circle Line, was openedfor service on 8 October 2011.To mark the successfulcompletion of the project,Sembawang jointly organised anevent with Telok Blangah Citizens’Consultative Committee on 17<strong>August</strong> <strong>2012</strong> at Telok BlangahCommunity Centre to thank theresidential community, clubs andother stakeholders for their supportand active cooperation from startthrough to completion of Circle LineStage 5 Contract 856 construction.The event paid tribute to allstakeholders who had shown greatunderstanding throughout the entireduration of the project, enduring thenoise, dust and vibrations that areinevitably generated from work sitesdue to the nature of constructionwork. That unstinted supportfrom the community ensured thesuccessful completion of the project.Throughout this project,Sembawang played its part inimproving the quality of transportinfrastructure by speeding up travelUpdate > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>34


for all commuters, breathing life intothe newly connected sub-regionalcentres. Visiting friends and relativesis now easier and more pleasurablewith the quality of life greatlyimproved.Well done, Sembawang.35 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


Showcasing CompetenceIntertraffic Exhibition<strong>Punj</strong> <strong>Lloyd</strong> is renowned forexecuting a diverse range oftechnologically challenging andcomplex infrastructure projects.From transportation - MetroSystems, Airports, Seaports,Highways and Expressways tothe entire gamut of buildingscommercial,industrial, townshipsand industrial parks, our servicesextend to utilities-water treatmentplants and reservoir. We undertakethese projects variously under Build,Own and Operate (BOO), as well asBuild, Own, Operate and Transfer(BOOT) basis.To showcase this wealth ofexpertise in civil infrastructure tointernational, national visitors andclients, <strong>Punj</strong> <strong>Lloyd</strong> exhibited at theIntertraffic Exhibition in New Delhi.The exhibition reflected how atevery stage of the project, the <strong>Punj</strong><strong>Lloyd</strong> team is passionately engagedin adding value. From tapping intothe capabilities of its in-house designdivision, to precast solutions thathelp achieve fast-track construction.The goal is always to create highqualityinfrastructure that embodiesaesthetics, economics, serviceabilityof the development and sustainabilityof the environment.The exhibition was also a platformto interact with the Group’s differentvalue partners in infrastructureprojects-manufacturers, suppliers,planners, consultancy firms, ITSTraffic Management companies,safety, parking & environment serviceproviders. •Def Expo <strong>2012</strong>Other than its EPC capabilities inEnergy and Infrastructure, the Grouphas strategically diversified into thedefence industry and developedcapability and infrastructure thatcan be effectively leveraged forAerospace & Defence programs.To showcase its Defenceexpertise, <strong>Punj</strong> <strong>Lloyd</strong> had a largepresence in the Def Expo <strong>2012</strong>.<strong>Punj</strong> <strong>Lloyd</strong> has set up a worldclass greenfield manufacturing facilityon 65 acres of land at Malanpur, nearGwalior. The facility has capabilityto undertake fabrication, precisionmachining, welding & heat treatmentand final testing of components andassemblies.The Group has a multi prongeddefence strategy with an objective to:• Become a supplier of choice tothe Indian armed forces• Be a preferred partner for transferof technology from global primesby setting up manufacturingfacilities in India• Be a part of the global defenceequipment supply chain• Undertake maintenance,repair and overhaul of defenceequipment• Work in partnership withglobal primes to meet offsetrequirements as per the IndianDefence Procurement Procedure.<strong>Punj</strong> <strong>Lloyd</strong> has identified keytechnological partners and plans tomanufacture defence products at itsfacility for the Indian Armed Forces’requirements. The Group is activelyUpdate > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>36


pursuing artillery and air defenceprograms and is all set to field itssolution for upgraded Zu 23-2B airdefence gun for NCNC trials.The Group is committed to workwith DRDO and OFB to indigenouslydevelop genuine force multipliers toprovide a decisive edge to the IndianArmed Forces. •CSR Live WeekThere is no higher religionthan human service. To workfor the common good is thegreatest creed.”Woodrow T. WilsonThis quote mirrors <strong>Punj</strong> <strong>Lloyd</strong>’sguiding principles in its CorporateSocial Responsibility (CSR) initiatives.This forms the basis of our belief ofuniversal giving.Consequently, CommunityDevelopment is at the heart of theCompany’s CSR initiatives. Acrossdiverse geographies and with globalcommunities, the company worksin harmony with local cultures, toempower societies.<strong>Punj</strong> <strong>Lloyd</strong> participated in theCSR Live Week, an initiative toprovide a common platform to sharethe various welfare programmesbeing implemented by companies.Akin to its global businessoperations, <strong>Punj</strong> <strong>Lloyd</strong> communityinitiatives keep sustainabilityat its core, addressing social,environmental and economicconcerns. From communityenrichment at global project sites tothe holistic welfare of Indian migrantlabourers, its programmes benefitsocieties with different needs. Itsintegrated and inclusive villagedevelopment approach has set anexample of a model Indian village. Itbelieves that support to national andinternational art and culture forumspreserves the rich cultural heritage ofIndia.The company sees every need insociety as an opportunity to serve.After all, goodness is what goodbusinesses deliver. This diversity ofactivities across global populationstruly renders <strong>Punj</strong> <strong>Lloyd</strong>’s CSRenduring. •Towards making India‘Design Enabled’As a diversified globalconstruction group with a strongfocus on design and engineering,<strong>Punj</strong> <strong>Lloyd</strong> took a significant stepto promote cross cultural design inIndia.Inaugurated by UrbanDevelopment Minister, Kamal Nath,IDF represented the country’s firstand most influential internationaldesign platform, bringing togetherdoyens of the global design world.A pioneering nine-day celebrationof India’s distinctive designaesthetic and its interaction withthe international design world,this inaugural forum began withDesign Week, which featuredmovie screenings, exhibitions andworkshops and culminated with thetwo day Design Forum, featuringtalks by design virtuosos at NewDelhi.Speaking at the Forum, ChairmanAtul <strong>Punj</strong> said: “In the West, designplays an integral role in improving thequality of life. In India, it must have37 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


elevance for the masses.”<strong>Punj</strong> <strong>Lloyd</strong> support to the IndiaDesign Forum will be a foundationtowards design playing a key rolein driving planned development,economic and industrial growth ofthe nation.Leading by ThoughtChairman Atul <strong>Punj</strong> shares histhoughts on India Design Forum andthe importance of integrating designin everyday life.Why did you choose to participate inthe India Design Forum?One of its kind, India Design Forumis an ideal platform to promote crosscultural design and philosophy. Thequality of international speakersand their complete mastery overdesign and its various nuancesattracted immense interest. As adiversified global construction groupwith a strong focus on design andengineering, the forum is of greatrelevance to us.What is the one thing that you wouldlike to discover in India?I would definitely like to see sustainablecities develop in India. I wouldalso like to see fantastic designs inpublic utilities, buildings and infrastructure.Today in India design isdistant from the life of the commonman; hence a synchronised integrationof design in India’s everyday lifeis what I would like to see.What is the quality you wish everydesigner had?Ability to see the potential of adesign. Looking around, even inyour daily life, you see a plethoraof objects that could have beendesigned far better, had somethought being given during theircreation!What do you appreciate mostamong designers?A streak of madness and the urgeto create something new anddifferent! •Safety Week CelebrationAt Malanpur: The Manufacturing& Systems Integration Division(MSID), established by <strong>Punj</strong> <strong>Lloyd</strong>in Malanpur to serve as a hubfor artillery, air defence systems,armoured vehicles, upgrades andmodifications for Indian Defencerequirements, has in a short span oftime since its inception received theISO 9001, 14001, OHSAS 18001certification, reflecting its adherenceto best industry practices andsystems.The division celebrated the41st National Safety Week fromMarch 4-11, <strong>2012</strong>. The programmecommenced with flag hoisting,following which the workerspledged to observe safety rulesand regulations. A number ofsafety drills were performed whichincluded fire fighting mock drill,plant safety inspection and HSEtraining. In addition, health & TTvaccination camp was organisedwherein 68 MSID team membersunderwent general fitness test& were administered the TTvaccination. The week concludedwith the distribution of prizes to thewinners of Quiz, Poster and Slogancompetitions.Gurgaon : Simultaneously, theCorporate office at Gurgaon alsohad the Senior Management of <strong>Punj</strong><strong>Lloyd</strong> and the employees take theSafety pledge. •Arrest the changeIncreasingly climate changeis being recognised as the major,overriding environmental issue ofour time, and the single greatestchallenge facing the entire globe.<strong>Punj</strong> <strong>Lloyd</strong> teamed with RobertSwan, the first person to havewalked both the North and the SouthUpdate > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>38


Pole, and other corporates to leadthe Ganges Expedition from Gangotrito the Goumukh Glacier. Thisexpedition focused on clean water,sanitation and renewable energy inschools, homes and the workplaceas well as the importance of water inthe Indian Tiger Reserves. •Inaugurationof Bayfront StationIt was a proud moment forSembawang when Land TransportAuthority (LTA) inaugurated BayFrontstation on <strong>January</strong> 14, <strong>2012</strong>where Sembawang was the EPCcontractor. The station is part ofSembawang’s Mass Rapid Transit(MRT) Downtown Line (DTL) Stage 1C906 project. When completed, theDowntown Line will be a 42 km linethat facilitates direct travel from thenorthwestern and eastern areas ofthe island to the Central BusinessDistrict (CBD) and Marina Bay.The Line also provides a strategictransport link to support and developMarina Bay area. This station is setto be the future interchange betweenthe Downtown Line and Circle Line.Sembawang is proud to leavea footprint right in the centre ofSingapore’s bustling Marina Baydevelopment. •Launch of Equarius HotelThe 20 units of Beach Villas andthe eco-luxurious hotels, the 172-room Equarius Hotel TM were openedfor business at Resorts World TMSentosa on February 16, <strong>2012</strong>.Located at the west zone of theintegrated resort, the iconic resortstylearchitecture development haspanoramic views of the waterfront,Keppel Bay and Labrador Park.The Equarius Hotel TM and BeachVillas were part of the scope ofSembawang’s project which includedthe construction of its world-classdestination spa-ESPA TM : set to bethe world’s largest oceanarium-theMarine Life Park, and the watertheme park.When Sembawang’s project iscompleted and launched, ResortsWorld TM Sentosa will be the firstintegrated resort to be positionedas Asia’s top family-holidaydestination. •SembawangDeclared a STARSembawang has been conferredthe STAR Green and GraciousBuilder Award by the Building andConstruction Authority in May <strong>2012</strong>.The Green and Gracious BuilderAward aims to raise environmentalconsciousness and professionalismof builders. It recognises progressivebuilders who take the effort toaddress environmental and publicconcerns arising from constructionwork and serves to develop a morepositive image of the industry overtime.It was a moment of great pridefor the entire Group as SEC hasscaled to the STAR category fromits ‘Excellent’ the previous year. In2011, Sembawang also won twoproductivity awards, Best ValueAdded Productivity (VAP) BuilderAward and Best Value AddedProductivity Improvement BuilderAward, all conferred by BCA.On receiving the award,President & CEO, Ric Grosvenorsaid “Sembawang is delighted toreceive the Green and GraciousAward. There is nothing better thanbeing recognised for an initiative asrelevant as this. Measures to ensuresustainability of business and theenvironment need to be high on theagenda for all organisations. It is thecombined efforts of all companiesthat will result in a positive,measurable impact in saving ourenvironment.” •39 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


Atul <strong>Punj</strong> at the India-Sri Lanka CEOs’ Forum in Colombo, with Anand Sharma, Hon’ble Minister for Commerce,Industry and Textiles, S R Rao, Commerce Secretary of India and Ashok Kantha, High Commissioner of India toSri Lanka, calling upon Mahindra Rajapaksa, Hon’ble President of Sri Lanka (centre) and Mr Rishad Bathiudeen,Commerce Minister of Sri Lanka (bottom left). •<strong>Punj</strong> <strong>Lloyd</strong> Group team (L-R)Sunil Krishna, Rajat Seksaria,S S Raju, Luv Chhabra alongwith former Commissioner,Delhi Police, V K Gupta,andthe entire Delhi Police teamat the Concession AgreementSigning for the developmentof Police Residential Complexat Dheerpur, Delhi on Design,Build, Finance, Operate andTransfer basis. •Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>40


Employees at the Tree Plantation drive at the Biodiversity Park, GurgaonWorldEnvironmentDay beingcelebratedat theManufacturing& SystemsIntegrationDivision(MSID),Malanpur,India.Atul <strong>Punj</strong> (1st fromright) as part of CII CEODelegation to Myanmaron occasion of the visitof Dr Manmohan Singh,Hon’ble Prime Ministerof India.A K Tewari,GM (MM)of ONGCand SunilSardana, Sr General Manager-Marketing, <strong>Punj</strong> <strong>Lloyd</strong>, signing theWO-16 and SB-14 pipeline project.Union Minister for Energy of Myanmar, U Than Htayreceives Atul <strong>Punj</strong>, Chairman <strong>Punj</strong> <strong>Lloyd</strong> along with Director,P K Gupta. Myanmar occupies a critical geo-strategicposition in the world. It is a meeting point of South Asia,East Asia and South-East Asia. Closer engagement withMyanmar will give a boost to India’s Look East Policy.Inparticular, <strong>Punj</strong> <strong>Lloyd</strong> made its maiden foray into Myanmar,securing the Myanmar-China oil and gas pipeline project comprising 183 kms of oil pipeline and 205 kms of gaspipeline. The project will be implemented from <strong>2012</strong>-13. •41 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


Middle East projects updateOil & Gas Export Pipelines,Kashagan Project,Kazakhstan<strong>Punj</strong> <strong>Lloyd</strong> Kazakhstan hasreceived an appreciation letter fromClient AGIP KCO for the KashaganField Development programme. Theclient has commended <strong>Punj</strong> <strong>Lloyd</strong> forovercoming challenging barriers likeremoteness of site, vagaries of natureand yet maintaining high standards ofsafety and quality.The project entailed DetailedEngineering, Procurement andConstruction of (24'' dia) 49.5 kmoil pipeline with two crossings byhorizontal directional drilling methodand 90 km gas pipeline in Atyrauregion of western Kazakhstan.AGIP KCO has also awarded<strong>Punj</strong> <strong>Lloyd</strong> the safety certificatefor 9 million safe man hours.Commenting on the occasion, AtulJain, President & CEO, MEA & CISsaid “This is a double victory for us.Not only has our execution beenappreciated but we have also beenrecognised for delivering withoutcompromising on safety”. •NDIA Project, QatarThe Project team at the NewDoha International Airport project(NDIA) has received a certificatefor completing 8 million manhourswithout lost time injury.The project involved thedesign, engineering, procurement,construction, start-up andcommissioning of the Fuel systemsfor New Doha International Airport.The objective being to filter A-1 JetFuel to achieve 1 ppm purity andprovision to fill fuel in sixteen aircraftsimultaneously within a stipulatedtime. The work includes the fuelreceiving station that unloads Jet A1fuel from tankers or receives throughpipeline from Qatar Petroleum anddelivers the filtered product into fuelfarm storage tanks, each of 9,000cub mtr capacity using fuel hydrantpumps.A 35 km pipeline network isspread across the airport facility tocater to 183 aircraft filling points.Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>42


On the occasion, President &CEO, MEA & CIS, Ravindra Kansal,congratulated the team saying "It isan achievement. Good going andkeep it up. Please wish entire projectteam of NDIA". •Ground BreakingCeremony at FalconProject, Dubaiterminal and associated facilitiesrequired for jetfuel handling in thetank farm including tanks, filtrationsystem, fast flush system, pumping& pigging stations, buildings, E&Ietc. The project will help establisha storage facility at Jebel Ali FreeZone Area (JAFZA), which is oneof the world’s largest and thefastest growing free zones, for thedistribution of various petroleumproducts to Dubai InternationalAirport (DIA). •approximately US$1bn in Qatar, tomanufacture high-purity solar gradepolysilicon. Very recently, <strong>Punj</strong> <strong>Lloyd</strong>has also received the Phase II of thisproject. With phase II expansion, thecombined value of this project is Rs4,033 crores (US$ 724.25 million) fora capacity of 8,000 MTPA. •<strong>2012</strong> MEA-CIS RegionLeadership meeting<strong>Punj</strong> <strong>Lloyd</strong> gets Phase IIof Qatar’s First PolysiliconProjectThe EPC contract for FalconJetfuel Pipeline & Bulk TerminalFacilities was awarded to <strong>Punj</strong><strong>Lloyd</strong> by Emirates National OilCompany (ENOC), wholly-owned bythe Government of Dubai. Valuedat Rs 623 crore (USD 126.86Million), the project is scheduled forcommissioning by 2013.The scope of work for the projectentails engineering, procurementand construction of jetfuel pipeline24"/20"/16" x 60 km, 141,000 m 3<strong>Punj</strong> <strong>Lloyd</strong> Group is executingthe first polysilicon plant of Qatar.Awarded by Qatar Solar Technologies(QSTec), the contract was part ofQSTec’s plans to set up a plant worthIn a Leadership Meetingorganised at Abu Dhabi in May,the MEA CIS team got together todiscuss business plans, processimprovement and growth initiativesfor the region. The meetings wereaddressed by the CEOs whoprompted the employees to continuethe regional momentum and successthrough improved team work. Allattendees participated with greatenthusiasm in all team eventsincluding Treasure Hunt and DragonBoat race. •43 Update > <strong>January</strong> - <strong>August</strong> <strong>2012</strong>


REGISTERED OFFICE<strong>Punj</strong> <strong>Lloyd</strong> Ltd<strong>Punj</strong> <strong>Lloyd</strong> House, 17-18 Nehru Place, New Delhi 110 019, IndiaT +91 11 2646 6105 F +91 11 2642 7812info@punjlloyd.comCORPORATE I78 Institutional Area, Sector 32, Gurgaon 122 001, IndiaT +91 124 262 0123 F +91 124 262 0111CORPORATE II95 Institutional Area, Sector 32, Gurgaon 122001 IndiaT +91 124 262 0769 F +91 124 262 0777REPRESENTATIVE OFFICESSembawang Engineers and Constructors Pte Ltd460 Alexandra Road, #27-01 PSA BuildingSingapore 119963T +65 6305 8788 F +65 6305 8568bd@sembawangenc.com<strong>Punj</strong> <strong>Lloyd</strong> Ltd21-22, Grosvenor Street, London WIK4QJ, United KingdomT +44 207 495 4143 F +44 207 495 7937farah@punjlloyd.comPL Engineering Ltd5-7 Udyog Vihar, Phase IV, Gurgaon 122 016, IndiaT +91 124 486 0000 F +91 124 486 0001info@ple.co.inSOUTH ASIA<strong>Punj</strong> <strong>Lloyd</strong> Ltd303 Leela Business Park, 3rd FloorAndheri Kurla Road, Andheri (East)Mumbai 400 059, IndiaT +91 22 6748 7500F +91 22 6748 7555dmankame@punjlloyd.comASIA PACIFICPT <strong>Punj</strong> <strong>Lloyd</strong> IndonesiaWisma GKBI, 17th Floor, Suite 1708Jl. Jend, Sudirman No. 28Jakarta 10210, IndonesiaT +62 21 5785 1944F +62 21 5785 1942info@ptpli.comPT Sempec IndonesiaWisma GKBI, 12th Floor, Suite 1209Jl. Jend, Sudirman No. 28Jakarta 10210, IndonesiaT +62 21 574 1128F +62 21 574 1130sempec@sempecindonesia.co.id<strong>Punj</strong> <strong>Lloyd</strong> Oil & Gas (Malaysia)Sdn BhdSuite 1006, 10th Floor, MenaraAmcorp,18 Jln. Persiaran Barat46200 Petaling Jaya SelangorMalaysiaT +60 3 7955 5293F +60 3 7955 5290asiapacific@punjlloyd.com<strong>Punj</strong> <strong>Lloyd</strong> Group JVSun Towers Building, Tower BUnit B 2904, 29th Floor123 Vibhavadi, Rangsit RoadChatuchak, Bangkok 10900ThailandT +66 2 617 6755F +66 2 617 6756asiapacific@punjlloyd.com<strong>Punj</strong> <strong>Lloyd</strong> Pte Ltd60 Alexandra Terrace, #09-01The Comtech (Lobby A)Singapore 118502T +65 6309 9040F +65 6820 7652asiapacific@punjlloyd.comCASPIAN<strong>Punj</strong> <strong>Lloyd</strong> Kazakhstan LLPPlot No. 7 ‘A’, Atyrau Dossor HighwayDSK Region, Atyrau 060000Republic of KazakhstanT +7 7122 395 021/42F +7 7122 395 038plk@punjlloyd.com<strong>Punj</strong> <strong>Lloyd</strong> Kazakhstan LLP54 Turkmenbashi Shayoly AvenueAshgabat, TurkmenistanT +971 5081 84492plk@punjlloyd.comMIDDLE EAST<strong>Punj</strong> <strong>Lloyd</strong> LtdP O Box 28907, 502 Al Ghaith TowerHamdan Street, Abu Dhabi, UAET +971 2 626 1604F +971 2 626 7789pllme@punjlloyd.com<strong>Punj</strong> <strong>Lloyd</strong> LtdP O Box 55174, 18th FloorAl Fardan Tower, West BayDoha, State of QatarT +974 4407 4555F +974 4407 4500pllme@punjlloyd.com<strong>Punj</strong> <strong>Lloyd</strong> LtdOffice No. 61, Building 2080Road 2825, Block 428Seef Tower BuildingAl Seef, P O Box 65017Bab Al BahrainKingdom of BahrainT +973 1756 4500F +973 1767 8500pllme@punjlloyd.com<strong>Punj</strong> <strong>Lloyd</strong> LtdP O Box 704, Postal Code 133Office No. 21, 2nd Floor, Zakia PlazaBousher Area, Al KhuwairMuscat, Sultanate of OmanT +968 2450 4594F +968 2450 4593pllme@punjlloyd.com<strong>Punj</strong> <strong>Lloyd</strong> LtdP O Box 50082, MukkallaRepublic of YemenT +967 5 384 386F +967 5 212 022pllme@punjlloyd.comDayim <strong>Punj</strong> <strong>Lloyd</strong> ConstructionContracting Co LtdTanami Tower, 8th FloorPrince Turki Street (Near Corniche)P O Box 31909, Al-Khobar 31952Kingdom of Saudi ArabiaT +966 3 896 9241F +966 3 896 9628mkt@punjlloyd.comAFRICA<strong>Punj</strong> <strong>Lloyd</strong> LtdP O Box 3119Goth Alshaal Alwahda AreaTripoli-G.S.P.L.A.J, LibyaT/F + 218 21 5567 0123ksaha@punjlloyd.com<strong>Punj</strong> <strong>Lloyd</strong> Kenya LtdPlot No. 1870/VI/254/255/256Kalamu House, Westlands, NairobiPO Box 47323 - 00100Nairobi (Kenya)T +254 7887 11363pllme@punjlloyd.comEnergy • Infrastructure • Defencewww.punjlloydgroup.com