Explanation <strong>of</strong> <strong>Fire</strong> Alarm Interface with Elevators<br />

September-2011<br />

Notes:<br />

• There can be many variations <strong>of</strong> the accompanying “Pictorial Representation <strong>of</strong> <strong>Fire</strong> Alarm Interface<br />

with Elevators.”<br />

• In this example, the smoke <strong>and</strong> heat detectors are addressable initiating devices <strong>and</strong> the operating<br />

relays are “hardwired.”<br />

• To achieve supervision, the relay circuits are operated from supervised control circuits. Sometimes<br />

NACs (Notification Appliance Circuits) are used to accomplish this function.<br />

• The supervisory initiating device that monitors the power for the shunt trip circuit is connected to a<br />

supervisory IDC (Initiating Device Circuit).<br />

• The scenario assumes that:<br />

1. There is a sprinklered elevator hoistway.<br />

2. Means to disconnect the main line power to the elevator is via a shunt trip breaker.<br />

3. System operation is in accordance with NFPA 72.<br />

4. Relay (R5) <strong>and</strong> an IDC (Initiating Device Circuit) have been included to provide indication<br />

(via a supervisory alarm) <strong>of</strong> absence <strong>of</strong> voltage (power) to operate shunt trip breaker.<br />

Components Function<br />

R1 --------------- Signal to elevator controller for recall to designated level.<br />

R2 --------------- Signal to elevator controller for recall to alternate level.<br />

R3 --------------- Signal to elevator controller for firefighter notification.<br />

R4 --------------- Signal to activate shunt trip relay.<br />

R5 --------------- Supervisory relay to monitor presence <strong>of</strong> voltage (power) to operate shunt trip<br />

breaker.<br />

SCC1 ----------- Supervised Control Circuit for operating R1.<br />

SCC2 ----------- Supervised Control Circuit for operating R2.<br />

SCC3 ----------- Supervised Control Circuit for operating R3.<br />

SCC4 ----------- Supervised Control Circuit for operating R4.<br />

IDC1------------ Initiating Device Circuit to supervise R5 contacts (monitoring power to operate shunt<br />

trip breaker).<br />