12.07.2015 Views

Sepam 2000 - Schneider Electric

Sepam 2000 - Schneider Electric

Sepam 2000 - Schneider Electric

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

InstallationAssembly and wiringDimensions and drillingdrilling diagram<strong>Sepam</strong> <strong>2000</strong> is flush-mounted in a rectangularcut-out.Maximum thickness of mounting: 3 mm.mounting lugs (x 2)<strong>Sepam</strong> A (mm) B (mm) C (mm)222201202S26 * 244 250 264S36 * 332 338 352* S25, S35 for earlier versions20 300BCAAssemblyb insert <strong>Sepam</strong> <strong>2000</strong> through the front of the cut-out.Slide it into the cut-out until the front of <strong>Sepam</strong> <strong>2000</strong>is in contact with the mounting plate. The 2 notches(1) at the base of the <strong>Sepam</strong> <strong>2000</strong> case allowit to hold by its own weight.b position the 2 lugs (2) in the holes on the topof <strong>Sepam</strong>. Tighten the threaded studs of the lug.b make sure not to block the ventilation openingson the top and bottom of <strong>Sepam</strong> <strong>2000</strong>. Leave a spaceof at least 5 cm above and below <strong>Sepam</strong>.(2)(2)(1)HV/MV substation Installation - Use - Commissioning1/7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!